Loading...
HomeMy WebLinkAbout2.15.24 Policy Board Meeting PacketFranklin County Planning Department 272 North Second Street Chambersburg, PA 17201 Phone: 717-261-3855 Fax: 717-264-8667 Email: planning@franklincountypa.gov FRANKLIN COUNTY METROPOLITAN PLANNING ORGANIZATION POLICY BOARD MEETING February 15, 2024 – 10am Franklin County Administrative Building, Room 824 272 North 2nd Street Chambersburg, PA 17201 Video call link: https://meet.google.com/pjb-aqzr-qeu Or dial: - - PIN: # I.Welcome and Introduction – Sam Cressler II.Election of Officers a.Chair b. Vice-Chair c.Secretary III.Approval of Meeting Minutes – November 16, 2023 – Action IV. Business a.2024 Safety Performance Targets PM-1 – Staff, Action b. 2024-2025 UPWP Final Draft Adoption - Action c.2025-2028 TIP Development - Informational V.Partner Updates a.Susquehanna Regional Transportation Partnership Update b. Rabbittransit Update - Presentation c.PennDOT Update d. FHWA Update e.Director’s Report – Steve Thomas f.Staff Report – Matthew Romero VI. Future Meetings a.April 18 – TAC Meeting 9:30 A.M. b. May 16 – Policy Board Meeting 10 A.M. VII. Public Comment VIII. Adjournment “The FCMPO is committed to complying with the nondiscrimination requirements of the Title VI of the Civil Rights Act of 1964 and related statutes and regulations prohibiting discrimination in all programs and activities. All locations for meetings open to the public will be accessible to persons with disabilities. With advance notification, accommodations may be provided for those with special needs related to language, speech, sight, or hearing. If you have a request for a special need, wish to file a complaint, or desire additional information, please contact the Franklin County Planning Department at (717) 261-3855; FAX (717) 264-8667; email: planning@franklincountypa.gov.” FFY 2023-2026 TIP MODIFICATIONS FORM Item Project Title MPMS Ph Prog Fed Sta.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc. Rocky Mtn Rd ov Little Antietam Cr Before 185 440,812 90,075 233/023 Adjust 185 -440,812 -90,075 Franklin After Franklin Bridge Reserve Before BOF 185 160,688 160,688 143,128 30,644 160,687 Adjust BOF 185 440,812 90,075 Franklin After BOF 185 601,500 250,763 143,128 30,644 160,687 PA997 & SR2015 Intersection Before HSIP 350,000 997/037 Adjust HSIP 329,509 Franklin After HSIP 679,509 HSIP Line Item Before HSIP 657,678 981,000 662,730 Adjust HSIP -329,509 Franklin After HSIP 328,169 981,000 662,730 87825 CON This is a reserve line item. 4 1 90847 CON Removing the CON phase of Rocky Mtn Rd ov Little Antietam Cr in FFY 2027/2028 for $530,887. The construction phase will be done by PennDOT County Maintenance Forces. This project may consist of a bridge rehabilitation/replacement on PA233 (Rocky Mountain Road) over Little Antietam Creek in Guilford Township, Franklin County. This project has a current estimated let date of Jan. 1, 2027. 3 106709 ROW Increasing the ROW phase of PA997 & SR2015 Intersection in FFY 2024 for $329,509 due to additional property damages. This project consists of intersection improvements at the intersection of PA 997 and SR 2015 (Tomstown Road) in Washington Township, Franklin County. This project has a current estimated let date of Sept. 12, 2024. 2 87804 CON This is a reserve line item. Informed Coordinating Committee: 2/15/24 Informed Technical Committee: 1/18/24 (Canceled) FFY 2031 - FFY 2034 Remarks Franklin MPO Administrative Modification - Highway Funds FFY 2024FFY 2023 FFY 2025 FFY 2026 FFY 2023-2026 TIP MODIFICATIONS FORM Item Project Title MPMS Ph Prog Fed Sta.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc. FFY 2031 - FFY 2034 RemarksAdministrative Modification - Highway Funds FFY 2024FFY 2023 FFY 2025 FFY 2026 Leafmore Road over Back Creek Bridge Replacement Before 7212/0 Adjust 137,490 Franklin After 137,490 Leafmore Road over Back Creek Bridge Replacement Before 7212/0 Adjust 25,700 Franklin After 25,700 Leafmore Road over Back Creek Bridge Replacement Before 7212/0 Adjust 200 Franklin After 200 Leafmore Road over Back Creek Bridge Replacement Before 7212/0 Adjust 139,990 Franklin After 139,990 Leafmore Road over Back Creek Bridge Replacement Before 7212/0 Adjust 1,526,500 Franklin After 1,526,500 120765 CON Adding the UTL phase of Cloverleaf Rd over Little Chiques Ck Act 13 in FFY 2024 for $25,700 to the current estimate. This project is funded with Act 13 funds. This project may consist of a bridge replacement of Leafmore Road over Back Creek on the border of St Thomas and Hamilton townships in Franklin County. Adding the ROW phase of Cloverleaf Rd over Little Chiques Ck Act 13 in FFY 2024 for $200 to the current estimate. This project is funded with Act 13 funds. This project may consist of a bridge replacement of Leafmore Road over Back Creek on the border of St Thomas and Hamilton townships in Franklin County. Adding the FD phase of Cloverleaf Rd over Little Chiques Ck Act 13 in FFY 2024 for $139,990 to the current estimate. This projects is funded using Act 13 funds. This project may consist of a bridge replacement of Leafmore Road over Back Creek on the border of St Thomas and Hamilton townships in Franklin County. Adding the CON phase of Leafmore Road over Back Creek Bridge Replacement in FFY 2024 for $1,526,500 to the current estimate. This project is funded using Act 13 funds. This project may consist of a bridge replacement of Leafmore Road over Back Creek on the border of St Thomas and Hamilton townships in Franklin County. 8 120765 FD 9 6 120765 UTL 7 120765 ROW 5 120765 PE Adding the PE phase of Leafmore Road over Back Creek Bridge Replacement in FFY 2024 for $137,490 to the current estimate. This project is funded with ACT 13 funds. This project may consist of a bridge replacement of Leafmore Road over Back Creek on the border of St Thomas and Hamilton townships in Franklin County. FFY 2023-2026 TIP MODIFICATIONS FORM Item Project Title MPMS Ph Prog Fed Sta.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc. FFY 2031 - FFY 2034 RemarksAdministrative Modification - Highway Funds FFY 2024FFY 2023 FFY 2025 FFY 2026 PA997 & SR2015 Intersection Before HSIP 679,509 997/037 Adjust HSIP 316,454 13,055 Franklin After HSIP 995,963 13,055 PA997 & SR2015 Intersection Before HSIP 316,454 1,667,486 911,000 Before STP 312,000 997/037 Adjust HSIP -316,454 -13,055 Adjust STP After HSIP 1,654,431 911,000 Franklin After STP 312,000 Increasing the ROW phase of PA997 & SR2015 Intersection in FFY 2024/2025 for $329,509 due to additional property damages. The previous action will be undone due to a technical correction. This project consists of intersection improvements at the intersection of PA 997 and SR 2015 (Tomstown Road) in Washington Township, Franklin County. This project has a current estimated let date of Sept. 12, 2024. Decreasing the CON phase of PA997 & SR2015 Intersection in FFY 2024/2025 for $329,509 to better utilize current available funds. The construction phase is fully funded on the 2025 Draft TIP. This project consists of intersection improvements at the intersection of PA 997 and SR 2015 (Tomstown Road) in Washington Township, Franklin County. This project has a current estimated let date of Sept. 12, 2024. 10 106709 ROW 11 106709 CON FFY 2023-2026 TIP MODIFICATIONS FORM Item Project Title MPMS Ph Prog Fed Sta.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc. FFY 2031 - FFY 2034 RemarksAdministrative Modification - Highway Funds FFY 2024FFY 2023 FFY 2025 FFY 2026 Swamp Fox Rd over I-81 Before BRIP 309,000 914/003 Adjust BRIP 51,208 Franklin After BRIP 309,000 51,208 I-81 New Interchange (Exit 12)Before BRIP 185 265,237 197,764 427,669 427,669 Before NHPP 581 1,531,300 1,637,000 3,758,000 1,637,000 3,758,000 Before STP 1,062,367 2,732,635 2,732,635 Adjust BRIP 185 -51,208 81/075 Adjust NHPP 581 Adjust STP After BRIP 185 214,029 197,764 427,669 427,669 After NHPP 581 1,531,300 1,637,000 3,758,000 1,637,000 3,758,000 Franklin After STP 1,062,367 2,732,635 2,732,635 93055 12 PE 13 CON 117156 Increasing the PE phase of Swamp Fox Rd over I-81 in FFY 2024 for $51,208 to the current estimate. This project may consist of a bridge rehabilitation/replacement on PA 914 (Swamp Fox Road) over I-81 in Guilford Township, Franklin County. This project has a current estimated let date of Jan. 1, 2028. Decreasing the CON phase of I-81 New Interchange (Exit 12) in FFY 2024 for $51,208 to better utilize current available funding. This project will be fully funded on the 2025 TIP. This project consists of a new interchange (Exit 12) on I-81 at Guilford Springs Road overpass, Franklin County. Guilford Springs Road is a Township Road. Bridge over I-81 is a state- owned bridge. This project has a current estimated let date of June 26, 2025. FFY 2023-2026 TIP MODIFICATIONS FORM Item Project Title MPMS Ph Prog Fed Sta.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc. FFY 2031 - FFY 2034 RemarksAdministrative Modification - Highway Funds FFY 2024FFY 2023 FFY 2025 FFY 2026 Newburg Road over Paxtons Run Before BRIP 210,000 Before 641/037 Adjust BRIP Adjust BOF 242,274 After BRIP 210,000 Franklin After BOF 242,274 Hykes Rd over I-81 Before BOF 350,000 3014/013 Adjust BOF 226,937 Franklin After BOF 226,937 Social Island Road Bridge-C Before BOF 1,013,000 87,800 Before STP 441,200 3012/027 Adjust BOF -469,211 Adjust STP After BOF 543,789 87,800 Franklin After STP 441,200 869,000 601,500 0 3,723,078 250,763 0 4,110,653 1,872,192 0 5,974,009 4,346,356 0 4,369,635 4,185,669 0 0 0 0 0 0 1,829,880 0 0 0 0 0 0 0 0 1,829,880 519,000 601,500 0 3,723,078 250,763 1,829,880 4,110,653 1,872,192 0 5,974,009 4,346,356 0 4,369,635 4,185,669 0 14 117157 PE 15 117143 PE 16 90969 CON Increasing the PE phase of Newburg Road over Paxtons Run in FFY 2024 for $242,274 to the current estimate. This project may consist of a bridge rehabilitation/replacement on PA 641 (Newburg Road) over Paxtons Run in Lurgans Township, Franklin County. This project has a current estimated let date of Jan. 1, 2027. Increasing the PE phase of Hykes Rd over I-81 in FFY 2024 for $226,937 to the current estimate. This project may consist of a bridge rehabilitation/replacement on SR 3014 (Hykes Road) over I-81 in Antrim Township, Franklin County. This project has a current estimated let date of Jan. 1, 2026. Decreasing the CON phase of Social Island Road Bridge-C in FFY 2024 for $469,211 to better utilize current available funding. This project will be fully funded on the 2025 TIP. This project consists of a bridge replacement on SR 3012 (Social Island Road) over Conococheague Creek in Guilford and Hamilton Townships, Franklin County. This project has current estimated let date of Dec. 10, 2026. After FFY Totals Before FFY Totals Program Summary - Net Changes Adjustments FISCAL CONSTRAINT CHART FFY 2023-2026 TIP Highway/Bridge Project Title MPMS Phase Amts Fed State Federal State Loc/Oth Federal State Loc/Oth Federal State Loc/Oth Federal State Loc/Oth Historic Metal Truss Bridge Preservation Reserve Before sSTP 1,265,000 1,700,000 2,000,000 /Adjust sSTP (200,000) Central Office After sSTP 1,065,000 1,700,000 2,000,000 Burnt Mill Road Bridge Before sSTP 7207/0 Adjust sSTP 200,000 Franklin After sSTP 200,000 $0 $0 $0 $1,265,000 $0 $0 $1,700,000 $0 $0 $2,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,265,000 $0 $0 $1,700,000 $0 $0 $2,000,000 $0 $0 FFY 2026 120800 PE Add phase. Administrative Action (MA ID: 133490) Statewide and Franklin TIPs Fund Type FFY 2023 FFY 2024 FFY 2025 114552 CON Actions do not affect air quality conformity. Remarks Historic Metal Truss Bridge Preservation Reserve used as source of funds to maintain fiscal constraint. NOTES Before Totals Adjustment Totals After Totals S:\Planning\MPO-RPO\Franklin County\Franklin MPO Meetings\2024 Meetings\January 2024\Statewide Actions\FCC410 - D8 HMTB sSTP MPMS 120800 PE add - efh COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF TRANSPORTATION Office of the Deputy Secretary for Planning 400 North Street | Harrisburg, PA 17120 | 717.787.3154 | www.penndot.gov November 8, 2023 Dear Planning Partners: Pursuant to the Code of Federal Regulations (23 CFR § 490) regarding National Performance Management Measures for the Highway Safety Improvement Program (HSIP), Pennsylvania has established the 2024 targets for the following Safety Performance Measures: 1) Number of fatalities 2) Rate of fatalities per 100 million Vehicle Miles Travelled (VMT) 3) Number of serious injuries 4) Rate of serious injuries per 100 million VMT 5) Number of non-motorized fatalities and serious injuries. The Pennsylvania Department of Transportation (PennDOT) is required to establish these targets by August 31st each year. The 2024 targets found in Table 1 of the enclosure are based on a data driven trend analysis of the statewide fatality and suspected serious injury numbers (2% annual fatality reduction and maintaining level suspected serious injuries). Metropolitan Planning Organization (MPOs) are required to establish targets within 180 days of PennDOT establishing its targets (by February 27, 2024) either by agreeing to plan and program projects in support of the PennDOT targets, or by establishing their own quantifiable targets. For consistency, PennDOT is requesting Rural Planning Organizations (RPOs) follow the same procedure. Table 2 of the enclosure reflects values for your MPO/RPO based on the same methodology that was used at the state level. The MPOs that establish quantifiable fatality rate or serious injury rate targets shall report the VMT estimate used for such targets and the methodology used to develop the estimate. The methodology should be consistent with other Federal reporting requirements, if applicable. MPOs/RPOs wishing to establish their own quantifiable targets are requested to coordinate with PennDOT as early as possible, but no later than December 31, 2023. A state is determined to have met or made significant progress toward meeting established targets if the outcome in 4 of 5 performance measures is better than the baseline number. For Pennsylvania’s 2022 targets, the Federal Highway Administration (FHWA) will report this determination by March 31, 2024. Preliminary data indicate Pennsylvania did not meet our 2022 targets and will be subject to the provisions of 23 United States Code § 148 (i). This will require the Department to submit an implementation plan that identifies gaps, develops strategies, action steps and best practices, and includes a financial and performance review of all HSIP funded projects. This plan will be due June 30, 2024. In addition, we will be required to obligate in Federal Fiscal Planning Partners Page 2 November 8, 2023 Year (FFY) 2025 an amount equal to the FFY 2021 HSIP apportionment. For more information, please visit the FHWA Safety Performance Management website at https://safety.fhwa.dot.gov/hsip/spm/. Your response is requested before February 27, 2024. Please complete the following: ______________________________________________________________________ Planning Organization Name Select one of the following options for establishing Safety Performance Measures: The MPO/RPO agrees to plan and program projects so that they contribute toward the accomplishment of the established PennDOT targets. The MPO/RPO will have the option to establish quantifiable targets of their own each year when new PennDOT targets are established. Table 2 of the enclosure reflects corresponding MPO/RPO values. The MPO/RPO has established quantifiable targets for each performance measure for our planning area. The targets and methodology used to develop them are enclosed with this letter. This option will require PennDOT coordination with the Federal Highway Administration to ensure that the targets established are not just aspirational but achievable based on the projects that are programmed on the MPO/RPO’s Transportation Improvement Program. If choosing this option please notify the Center for Program Development and Management (CPDM) by December 31, 2023. Concurrence: Authorized MPO/RPO Representative Date Should you have any questions, please contact Casey Markey, Transportation Planning Manager, Center for Program Development and Management, at 717.787.1251 or cmarkey@pa.gov. Sincerely, Sincerely, Larry S. Shifflet Michael W. Rebert, P.E. Deputy Secretary for Planning Deputy Secretary for Highway Administration Enclosure ☐ ☐ MPO/RPO Target Setting Enclosure October 10, 2023 Table 1: Statewide Targets: Performance Measure 5-year Rolling Averages TARGET ACTUAL BASELINE 2020-2024 2020-2024 2018-2022 Number of Fatalities 1,165.1 1157.4 Fatality Rate 1.219 1.182 Number of Serious Injuries 4,721.0 4682.4 Serious Injury Rate 4.939 4.783 Number of Non-motorized Fatalities and Serious Injuries 817.6 804.6 * Future VMT estimated to hold level over next few years Table 2: Franklin MPO Supporting Values: Performance Measure 5-year Rolling Averages TARGET ACTUAL BASELINE 2020-2024 2020-2024 2018-2022 Number of Fatalities 15.4 18.0 Fatality Rate 1.119 1.279 Number of Serious Injuries 68.4 66.8 Serious Injury Rate 4.971 4.747 Number of Non-motorized Fatalities and Serious Injuries 10.0 8.4 * Future VMT estimated to hold level over next few years