HomeMy WebLinkAboutIFB 2025291-01 - UPS Backup Center Questions & AnswersIFB 2025291-01 UP BACK UP SYSTEM FOR THE FRANKLIN COUNTY DEPARTMENT OF EMERGENCY SERVICES QUESTIONS & ANSWERS Q: I would formally like to request to make a substitution for the Riello Sentryum listed in the UPS Requirements. We would like to offer a Schneider Galaxy VS 20 kVA / 20 kW unit. Our solution would include all the 13 minutes of runtime, wall mount bypass panel, and 2 year warranty with 24/7/365 Onsite Emergency Support. A: Yes this is acceptable as an approved equal. Q: What is the make and model of the UPS to be removed and disposed of? We would like an idea of the size and weight. A: See Addendum 1. Q: Is there an elevator that can be used to bring the UPS to the ground level? A: Yes, see the Delivery & Start Up section of the Bid Specifications section of the bid document. Q: Does the building have a loading dock? A: No. Q: If there is not loading dock, does are there any steps or curbs getting to the parking lot. A: Yes, depending on the entry door selected, there are steps or curbs. The Lincoln Way East Entrance on the south side of the building has 3 steps inside the building. The east Emergency door is currently not available. There is a sally port that that can be used to access the building from the west side. That would then require the units being brought through an office area with cubicles to/from the elevator. Q: Regarding the Question and Answer Period, as it appears there are two different dates listed as the deadline within the IFB. Is the Q & A period deadline August 15, 2025 at 4:00 PM as listed under the Introduction - Section 4. Time Requirements, or was the deadline 4:00 PM Monday, August 11, 2025, as listed under the Question and Answer Period - Section 10.1? A: The deadline is August 15, 2025 at 4:00 PM. Q: We propose the Vertiv™ Liebert® EXS 20kVA model as an equivalent. This model includes a wall-mounted bypass and 2-year UPS & battery warranty included. A: Yes this is acceptable as an approved equal. Q: Is the 20KVA Xtreme Power M90U Series UPS an acceptable alternate. A: Yes the 20KVA is an approved equal. Q: Can the existing External Maint Bypass switch be used to reduce cost? A: There is no existing external bypass. Q: Request for pre-approval to substitute the equivalent Eaton 9355 20kVA/18kW UPS (Neutral Required) and 18 min runtime at full load with 3 Breaker Wall mounted MBP (30kVA 125A). A: Yes. Q: Since electrical and installation will be by the county's selected EC, will the EC also provide removal and disposal of the old UPS ? A: No, the removal and disposal of the current UPS system is part of this bid. *Clarification – by removal we mean removing it physically from the building and disposing of it. Any electrical work to detach it from our system will be done by a County provided electrician. Updated August 20, 2025 1:30 PM