HomeMy WebLinkAbout2025.8.21 Policy Board Meeting Packet
Franklin County Planning Department
272 North Second Street
Chambersburg, PA 17201
Phone: 717-261-3855
Fax: 717-264-8667
Email: planning@franklincountypa.gov
FRANKLIN COUNTY METROPOLITAN PLANNING ORGANIZATION
POLICY BOARD MEETING
August 21, 2025 – 10:00 am
Franklin County Administrative Building, Room 824
272 North 2nd Street
Chambersburg, PA 17201
Video call link: https://meet.google.com/ueq-ukui-tkc
Or dial: 3539-702-346US) +1 ( PIN: 617 284 298 #
I. Welcome and Introduction – Sam Cressler
II. Moment of Silence
III. Pledge of Allegiance
IV. Approval of Meeting Minutes – May 15, 2025 – Action
V. Business
a. 2025-2028 TIP Modifications – Discussion
b. 2027-2030 TIP Development - Discussion
c. MPO On-Call Consultant RFP – Discussion
d. TASA Update - Presentation
VI. Partner Updates
a. Commute PA Update
b. Rabbittransit Update
c. PennDOT Update
d. FHWA Update
e. State/Federal Legislative Update
f. Director’s Report – Quentin Clapper
g. Staff Report – Matthew Romero
VII. Future Meetings
a. November 20 – Policy Board Meeting 10:00 A.M.
VIII. Public Comment
IX. Adjournment
“The FCMPO is committed to complying with the nondiscrimination requirements of the Title VI
of the Civil Rights Act of 1964 and related statutes and regulations prohibiting discrimination in
all programs and activities. All locations for meetings open to the public will be accessible to
persons with disabilities. With advance notification, accommodations may be provided for those
with special needs related to language, speech, sight, or hearing. If you have a request for a special
need, wish to file a complaint, or desire additional information, please contact the Franklin County
Planning Department at (717) 261-3855; FAX (717) 264-8667; email:
planning@franklincountypa.gov.”
DRAFT
DRAFT
1
Franklin MPO Meeting Project Updates
August 2025 Meeting
Project Description West King Street Bridge
ECMS # 19304
SR-Section 11-095
Contractor J.D. Eckman, Inc.
Original Contract Value $12,877,625.31
NTP date 12/9/2024
Original Completion Date 11/14/2028
Project Scope This project consists of a bridge replacement on SR 0011 (West King
Street) over Norfolk Southern Railroad and other miscellaneous
construction, all as indicated on the approved drawings included in the
Bid Package for STATE ROUTE 0011, SECTION 095, in FRANKLIN
COUNTY, SOUTHAMPTON TOWNSHIP and SHIPPENSBURG BOROUGH,
from Segment 0540 Offset 3134 to Segment 0560 Offset 0111, for an
overall project length of 1,164.00 linear feet (0.306 mile).
Previous Update • We are still coordinating with Norfolk Southern Railroad to
begin work.
• Utility coordination meetings have begun and Brightspeed has
not started any of their prior work.
• Contractor wishes to start Spring/Summer of 2025 if all Utilities
and Railroad cooperate.
• Without Railroad coordination and utility relocations, physical
work will begin in Spring 2026.
Project Update • Coordination efforts are still on going with Norfolk
Southern Railroad and very little progress has been
made.
• Utility coordination has begun. Brightspeed installed
new utility poles. Tree trimming needs performed prior
to aerial relocations but currently no one has
permission to perform any work on Railroad right-of-
way.
• Physical work on bridge expected to start in Spring
2026.
• Project is just past the half- way mark of the built-in
one year coordination period at the beginning of the
project.
Project Description PA997 & SR2015 Intersection
ECMS # 106709
SR-Section 997-037
Contractor Mitchell Knorr dba Mitchell Knorr Contracting
Original Contract Value $6,224,217.92
2
NTP date 3/3/2025
Original Completion Date 8/22/2028
Project Scope
This project is for roadway widening, roundabout construction, ADA
curb ramps, drainage improvements, stormwater management,
lighting, and other miscellaneous construction, all as indicated on the
approved drawings included in the Bid Package for STATE ROUTE
0997, SECTION 037, and for STATE ROUTE 2015, SECTION 009, in
FRANKLIN COUNTY, WASHINGTON TOWNSHIP, from 800 feet south of
SR 2015 (Orchard Road/Tomstown Road) at Segment 0100 Offset
0098 to 1500 feet north of SR 2015 (Orchard Road/Tomstown Road) at
Segment 0110 Offset 0676.
Previous Update • Contractor started excavating for Post-Construction Stormwater
Control Measures, vegetated swales and drainage pipes.
• Temporary concrete barrier has been installed along SR997.
• Utilities have begun their relocations.
• Contractor plans to implement detour to Tomstown Road (local
road) in the near future.
• No project delays or overruns at this time.
Project Update • Contractor excavated for Post-Construction
Stormwater Control Measures, vegetated swales
and drainage pipes.
• Utilities remain to be relocated but are
progressing.
• Contractor is able to avoid delays and inefficiencies
while staying busy with various contract work items
until all utility relocations are completed.
• Tomstown Road (local road) remains closed and has
provided a safety improvement by reducing the
intersection from four legs down to three.
• Project has not experienced any major overruns or delays at this time.
Project Description I-81 Maryland to Mile 6
ECMS # 92006
SR-Section 81-099
Contractor New Enterprise Stone and Lime Co. Inc.
Original Contract Value $17,840,777.77
NTP date 3/24/2025
Original Completion Date 7/16/2027
3
Project Scope This project consists of milling, concrete patching, asphalt resurfacing,
guiderail updates, signage, and pavement markings on I-81
Northbound and Southbound from the Maryland State Line to Milepost
6, all as indicated on the approved drawings included in the Bid
Package for STATE ROUTE 0081, SECTION 099, in FRANKLIN COUNTY,
ANTRIM TOWNSHIP, from Segment 0002 Offset 0000 and Segment
0003 Offset 0000 to Segment 0060 Offset 1831 and Segment 0061
Offset 1831, including adjacent interchange ramps SR 8001, SR 8003,
and SR 8005, for an overall project length of 33,543.00 linear feet (6.35
miles).
Previous Update • Contractor scheduled to begin work Sunday evening May 11,
2025.
• Milling and removal of existing blacktop will take place first
followed by full and partial depth concrete patching and then
placement of asphalt binder course and stone matrix asphalt
wearing course.
• Nightly lane closures will take place from 7PM to 6AM Sunday
night through Thursday night with Friday night as a rain
makeup.
• Work this year will be from mile markers 3 to 6 Northbound and
Southbound.
• Work at Maryland state line will take place next year from state
line to mile marker 3 North and South.
• Contractor has requested and received permission to reduce
speed limit from 65MPH to 55MPH during work hours.
• State Police and Automated Work Zone Speed Enforcement will
be utilized.
Project Update • Contractor has placed 19mm asphalt binder course on
travel lanes southbound from mile marker 6 to mile
marker 3.
• Sunday evening August 3, 2025, concrete crews began
full and partial depth patching on northbound side from
mile marker 3 to mile marker 6.
• Project is moving along as planned except for rain and
weather delays. No significant overruns or delays at
this time.
Project Description Fort Loudon Rd Resurface 2
ECMS # 90995
SR-Section 75-014
Contractor Cottle's Asphalt Maintenance, Inc.
Original Contract Value $2,290,908.74
NTP date 8/4/2025
Original Completion Date 8/13/2027
4
Project Scope This project consists of work on SR 0075-014 with resurfacing the
existing roadway and shoulder using Superpave wearing and scratch
courses, milling in curbed areas and near structures, base replacement,
minor drainage improvements, and guide rail replacement along with
other miscellaneous construction, as indicated on the approved
drawings included in the bid package for STATE ROUTE 0075,
SECTION 014, in FRANKLIN COUNTY, MONTGOMERY TOWNSHIP and
MERCERSBURG BOROUGH, from SR 0995, Welsh Run Road at
Segment 0070 Offset 0541 in Montgomery Township to Buchanan Trail
W in Mercersburg Borough at Segment 0160 Offset 1427, for an overall
project length of 21,879.66 linear feet (4.14 miles).
Project Update • Pre-construction meeting was on Monday August 4,
2025.
• No physical work expected to start this year.
Project Description Chambersburg Signals Improvement Phase 2
ECMS # 116146
SR-Section 11-125
Contractor Bruce - Merrilees Electric Company
Original Contract Value $398,120.49
NTP date 9/8/2025
Original Completion Date 7/28/2026
Project Scope This project consists of Signal Improvements at 65 intersections in
various locations to include: radar detection, software updates, signal
optimization/retiming, and other miscellaneous construction, all as
indicated on the approved drawings included in the Bid Package for
STATE ROUTE 0011, SECTION 125, in FRANKLIN COUNTY,
CHAMBERSBURG BOROUGH and GREENE, HAMILTON, & GUILFORD
TOWNSHIPS, from Segment 0220 Offset 0700 to Segment 0370 Offset
2400.
Project Update • Working on scheduling the pre-construction
meeting with Contractor and Chambersburg Borough.
FFY 2025-2028 TIP MODIFICATIONS FORM
Item Project Title MPMS Ph Prog Fed Sta.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.
Social Island Road Bridge-C Before BOF 314,000 186,000
Before PRTCT 750,000
3012/027 Adjust BOF -314,000 -186,000
Adjust PRTCT
After
Franklin After PRTCT 750,000
Social Island Road Bridge-C Before BOF 80,000
Before PRTCT 109,000
3012/027 Adjust BOF -80,000
Adjust PRTCT
After
Franklin After PRTCT 109,000
Social Island Road Bridge-C Before BOF 70,000
Before PRTCT 109,000
3012/027 Adjust BOF -70,000
Adjust PRTCT
After
Franklin After PRTCT 109,000
Franklin Bridge Reserve Before BRIP 47,731 200,874
Before BOF 1,889
Adjust BRIP
Adjust BOF 314,000 336,000
After BRIP
47,731 200,874
Franklin After BOF 314,000 337,889
1
Decreasing the FD phase of Social Island Road Bridge-C for $500,000 in
FFY 2025/2026 to the current estimate. Statewide PROTECT funds are
replacing the Franklin TIP funds. This project may consist of a bridge
improvement (replacement, rehabilitation or preservation) on SR 3012
(Social Island Road) over Conococheague Creek in Guilford and Hamilton
Townships, Franklin County. This project has a current estimated let date of
Dec. 10, 2026.
2 90969 UTL
Decreasing the UTL phase of Social Island Road Bridge-C for $80,000 in
FFY 2026 to the current estimate. Statewide PROTECT funds are replacing
the Franklin TIP funds. This project may consist of a bridge improvement
(replacement, rehabilitation or preservation) on SR 3012 (Social Island
Road) over Conococheague Creek in Guilford and Hamilton Townships,
Franklin County. This project has a current estimated let date of Dec. 10,
2026.
3 90969 ROW
Decreasing the ROW phase of Social Island Road Bridge-C for $70,000 in
FFY 2026 to the current estimate. Statewide PROTECT funds are replacing
the Franklin TIP funds. This project may consist of a bridge improvement
(replacement, rehabilitation or preservation) on SR 3012 (Social Island
Road) over Conococheague Creek in Guilford and Hamilton Townships,
Franklin County. This project has a current estimated let date of Dec. 10,
2026.
4 87804 CON
90969 FD
Informed Coordinating Committee: 8/21/2025
Informed Technical Committee: N/A
FFY 2029 - FFY 2036
Remarks
Franklin MPO
Administrative Modification - Highway Funds FFY 2026FFY 2025 FFY 2027 FFY 2028
This is a reserve line item.
FFY 2025-2028 TIP MODIFICATIONS FORM
Item Project Title MPMS Ph Prog Fed Sta.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.
FFY 2029 - FFY 2036
RemarksAdministrative Modification - Highway Funds FFY 2026FFY 2025 FFY 2027 FFY 2028
Swamp Fox Rd over I-81 Before
914/003 Adjust BRIP 159,000
Franklin After BRIP 159,000
Swamp Fox Rd over I-81 Before BRIP 240,000
914/003 Adjust BRIP -99,000 99,000
Franklin After BRIP 141,000 99,000
Swamp Fox Rd over I-81 Before BRIP 40,000
914/003 Adjust BRIP -40,000 40,000
Franklin After BRIP 40,000
Swamp Fox Rd over I-81 Before BRIP 20,000
914/003 Adjust BRIP -20,000 20,000
Franklin After BRIP 20,000
Franklin Bridge Reserve Before BRIP 47,731 200,874
Before BOF 314,000 337,889
Adjust BRIP -159,000
Adjust BOF
After BRIP
47,731 41,874
Franklin After BOF 314,000 337,889
This is a reserve line item.
9 87804 CON
117156 ROW
5 117156 PE
Cashflowing the ROW phase of Swamp Fox Rd over I-81 for $20,000 from
FFY 2025 to FFY 2026 to better align with the current schedule. This
project may consist of a bridge improvement (replacement, rehabilitation or
preservation) on PA 914 (Swamp Fox Road) over I-81 in Guilford
Township, Franklin County. This project has a current estimated let date of
March 25, 2027.
8
7 117156 UTL
6 117156 FD
Adding the PE phase of Swamp Fox Rd over I-81 for $159,000 in FFY
2025 to convert advance construct funds to the current estimate. This
project may consist of a bridge improvement (replacement, rehabilitation or
preservation) on PA 914 (Swamp Fox Road) over I-81 in Guilford
Township, Franklin County. This project has a current estimated let date of
March 25, 2027.
Cashflowing the UTL phase of Swamp Fox Rd over I-81 for $40,000 from
FFY 2025 to FFY 2026 to better align with the current schedule. This
project may consist of a bridge improvement (replacement, rehabilitation or
preservation) on PA 914 (Swamp Fox Road) over I-81 in Guilford
Township, Franklin County. This project has a current estimated let date of
March 25, 2027.
Cashflowing the FD phase of Swamp Fox Rd over I-81 for $99,000 from
FFY 2025 to FFY 2026 to better align with the current schedule. This
project may consist of a bridge improvement (replacement, rehabilitation or
preservation) on PA 914 (Swamp Fox Road) over I-81 in Guilford
Township, Franklin County. This project has a current estimated let date of
March 25, 2027.
FFY 2025-2028 TIP MODIFICATIONS FORM
Item Project Title MPMS Ph Prog Fed Sta.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.
FFY 2029 - FFY 2036
RemarksAdministrative Modification - Highway Funds FFY 2026FFY 2025 FFY 2027 FFY 2028
US 30 Bridge over W Br Conococheaugue Creek Before BRIP 75,000
30/158 Adjust BRIP -75,000
Franklin After
US 30 Bridge over W Br Conococheaugue Creek Before 581 1,520,000 1,520,000
30/158 Adjust 581 -920,000 -1,520,000
Franklin After 581 600,000
Franklin Bridge Reserve Before BRIP 47,731 41,874
Before BOF 314,000 337,889
Adjust BRIP 75,000
Adjust BOF
After BRIP 47,731 116,874
Franklin After BOF 314,000 337,889
Highway Reserve Before STP 581 744,595 14,645 646,416 485,243 1,472,881 2,740,030
Adjust STP 581 920,000 1,520,000
Franklin After STP 581 744,595 14,645 646,416 485,243 2,392,881 4,260,030
This is a reserve line item.
This is a reserve line item.
12 87804 CON
13
10 117144 UTL
11 117144 CON
Removing the UTL phase of US 30 Bridge over W Br Conococheaugue
Creek for $75,000 in FFY 2026 due to no utility relocations. This project
may consist of a bridge improvement (replacement, rehabilitation or
preservation) on US 30 (Lincoln Highway) over the West Branch
Conococheague Creek in Peters Township, Franklin County. This project
has a current estimated let date of Nov. 5, 2026.
Decreasing the CON phase of US 30 Bridge over W Br Conococheaugue
Creek for $2,440,000 in FFY 2027/2028 to the current estimate for joint
work and scour protection. This project may consist of a bridge
improvement (replacement, rehabilitation or preservation) on US 30
(Lincoln Highway) over the West Branch Conococheague Creek in Peters
Township, Franklin County. This project has a current estimated let date of
Nov. 5, 2026.
87805 CON
FFY 2025-2028 TIP MODIFICATIONS FORM
Item Project Title MPMS Ph Prog Fed Sta.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.
FFY 2029 - FFY 2036
RemarksAdministrative Modification - Highway Funds FFY 2026FFY 2025 FFY 2027 FFY 2028
Fort Loudon Rd ov Buck Run Before
75/013 Adjust BRIP 26,046
Franklin After BRIP 26,046
Fort Loudon Rd ov Buck Run Before 185 230,000
75/013 Adjust 185 79,000
Franklin After 185 230,000 79,000
Fort Loudon Rd ov Buck Run Before 185 513,872 380,987
Before 581 591,289
75/013 Adjust 185 -79,000
Adjust 581 210,852
After 185 434,872 380,987
Franklin After 581 802,141
Franklin Bridge Reserve Before BRIP 47,731 116,874
Before BOF 314,000 337,889
Adjust BRIP -26,046
Adjust BOF
After BRIP 21,685 116,874
Franklin After BOF 314,000 337,889
Highway Reserve Before STP 581 744,595 14,645 646,416 485,243 2,392,881 4,260,030
Adjust STP 581 -210,852
Franklin After STP 581 744,595 14,645 646,416 485,243 2,182,029 4,260,030
18 87805 CON
This is a reserve line item.
This is a reserve line item.
17 87804 CON
Increasing the PE phase of Fort Loudon Rd ov Buck Run for $26,046 in
FFY 2025 for additional scope of work needed to complete Preliminary
Engineering. This project may consist of a bridge improvement
(replacement, rehabilitation or preservation) on US 30 (Lincoln Highway)
over the West Branch Conococheague Creek in Peters Township, Franklin
County. This project has a current estimated let date of Sept. 17, 2026.
7869016 CON
Increasing and cashflowing the CON phase of Fort Loudon Rd ov Buck Run
for $210,852 in FFY 2026/2027 to the current estimate. This project may
consist of a bridge improvement (replacement, rehabilitation or
preservation) on US 30 (Lincoln Highway) over the West Branch
Conococheague Creek in Peters Township, Franklin County. This project
has a current estimated let date of Sept. 17, 2026.
15 78690 FD
Increasing the FD phase of Fort Loudon Rd ov Buck Run for $79,000 in
FFY 2026 to the current estimate. This project may consist of a bridge
improvement (replacement, rehabilitation or preservation) on US 30
(Lincoln Highway) over the West Branch Conococheague Creek in Peters
Township, Franklin County. This project has a current estimated let date of
Sept. 17, 2026.
14 78690 PE
FFY 2025-2028 TIP MODIFICATIONS FORM
Item Project Title MPMS Ph Prog Fed Sta.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.
FFY 2029 - FFY 2036
RemarksAdministrative Modification - Highway Funds FFY 2026FFY 2025 FFY 2027 FFY 2028
Corner Road over Licking Cr Before BOF 274,000
3009/022 Adjust BOF 30,000
Franklin After BOF 304,000
Corner Road over Licking Cr Before
3009/022 Adjust BOF 30,000
Franklin After BOF 30,000
Corner Road over Licking Cr Before BRIP 1,156,126
Before
3009/022 Adjust BRIP
Adjust STP 237,874
After BRIP 1,156,126
Franklin After STP 237,874
Franklin Bridge Reserve Before BRIP 21,685 116,874
Before BOF 254,000 337,889
Adjust BRIP
Adjust BOF -60,000
After BRIP 21,685 116,874
Franklin After BOF 194,000 337,889
Highway Reserve Before STP 581 744,595 14,645 646,416 247,369 2,182,029 4,260,030
Adjust STP 581 -237,874
Franklin After STP 581 744,595 14,645 646,416 9,495 2,182,029 4,260,030
ROW
Increasing the FD phase of Corner Road over Licking Cr for $30,000 in
FFY 2025 to the current estimate. This project consists of a bridge
rehabilitation on SR 3009 (Corner Road) over Licking Creek in
Montgomery Township, Franklin County. This project has a current
estimated let date of Sept. 17, 2026.
Adding the ROW phase of Corner Road over Licking Cr for $30,000 in
FFY 2025 to the current estimate. This project consists of a bridge
rehabilitation on SR 3009 (Corner Road) over Licking Creek in
Montgomery Township, Franklin County. This project has a current
estimated let date of Sept. 17, 2026.
21 116963 CON
Increasing the CON phase of Corner Road over Licking Cr for $237,874 in
FFY 2027 to the current estimate. This project consists of a bridge
rehabilitation on SR 3009 (Corner Road) over Licking Creek in
Montgomery Township, Franklin County. This project has a current
estimated let date of Sept. 17, 2026.
23 87805 CON
19 116963 FD
20 116963
This is a reserve line item.
22 87804
This is a reserve line item.
CON
FFY 2025-2028 TIP MODIFICATIONS FORM
Item Project Title MPMS Ph Prog Fed Sta.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.
FFY 2029 - FFY 2036
RemarksAdministrative Modification - Highway Funds FFY 2026FFY 2025 FFY 2027 FFY 2028
PA997 & SR2015 Intersection Before HSIP 1,271,000 1,301,000 1,301,000 449,383
Before STP 726,486 619,000 214,757 1,041,535
997/037 Adjust HSIP
Adjust STP 619,000 -619,000
After HSIP 1,271,000 1,301,000 449,383
Franklin After STP 1,345,486 214,757 1,041,535
Highway Reserve Before STP 581 744,595 14,645 646,416 247,369 2,182,029 4,260,030
Adjust STP 581 -619,000 619,000
Franklin After STP 581 125,595 14,645 1,265,416 247,369 2,182,029 4,260,030
CON
24 106709 CON
25 87805
This is a reserve line item.
Cashflowing the CON phase of PA997 & SR2015 Intersection for
$619,000 from FFY 2026 to FFY 2025 to better utilize current available
funding. This project consists of installing two roundabouts at the
intersection of PA997 and SR2015 (Tomstown Road) and the intersection
of PA997 and Washington Township Boulevard in Washington Township,
Franklin County. This project was let on Jan. 16, 2025.
FFY 2025-2028 TIP MODIFICATIONS FORM
Item Project Title MPMS Ph Prog Fed Sta.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.
FFY 2029 - FFY 2036
RemarksAdministrative Modification - Highway Funds FFY 2026FFY 2025 FFY 2027 FFY 2028
Chambersburg Signals Imp Phase 2 Before CRP 356,060 169,940
Before CRPU
135,000 18,770
11/125 Adjust CRP
-33,221 -169,940
Adjust CRPU -18,770
After CRP 322,839
Franklin After CRPU 135,000
Carbon Reduction Program (CRP)
Chambersburg RSL Before CRP
370,060 540,000 540,000
Adjust CRP 33,221 169,940
Franklin After CRP 33,221 540,000 540,000 540,000
Carbon Reduction Program (CRP) Hagerstown
RSL Before CRPU
119,230 138,000 138,000
Adjust CRPU 18,770
Franklin After CRPU 138,000 138,000 138,000
7,763,535 288,580 0 9,749,605 513,872 0 3,658,981 10,341,109 0 2,168,918 17,421,107 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 07,763,535 288,580 0 9,749,605 513,872 0 2,357,981 10,341,109 0 2,168,918 17,421,107 0 0 0 0After FFY Totals
Before FFY Totals
Program Summary - Net Changes Adjustments
26 116146 CON
Decreasing the CON phase of Chambersburg Signals Imp Phase 2 for
$221,931 in FFY 2025/2026 to the low bid amount. This project consists of
upgrades of signals and interconnect improvements at 65 signalized
intersections in Chambersburg Borough, Guilford and Hamilton Townships,
Franklin County. These signal timing improvements aim to reduce vehicle
stops and delays, reduce congestion, and improve air quality. This project
was let on July 10, 2025.
This is a reserve line item.
This is a reserve line item.
27 119286 CON
28 119287 CON
FISCAL CONSTRAINT CHART
FFY 2025-2028 TIP Highway/Bridge
Project Title MPMS Phase Amts Fed State Federal State Loc/Oth Federal State Loc/Oth Federal State Loc/Oth Federal State Loc/Oth
PROTECT Reserve Before PRTCT 114,400 425,415 55,075,900 62,639,000
/Adjust PRTCT (38,233)
Central Office After PRTCT 76,167 425,415 55,075,900 62,639,000
SR 16 Retaining Wall Before
16/056 Adjust PRTCT 38,233
Franklin After PRTCT 38,233
$114,400 $0 $0 $425,415 $0 $0 $55,075,900 $0 $0 $62,639,000 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$114,400 $0 $0 $425,415 $0 $0 $55,075,900 $0 $0 $62,639,000 $0 $0
Remarks
Administrative Action (MA ID: 140579)
Statewide & Franklin TIPs Fund Type FFY 2025 FFY 2026 FFY 2027 FFY 2028
NOTES
118322 CON
PROTECT Reserve line item used as
source of funds to maintain fiscal
constraint.
121390 PE
Adding PE phase to cover
unexpected Right of Way services
and additional geotechnical effort.
Before Totals
Adjustment Totals
After Totals
Actions do not affect air quality
conformity.
\\pdkbdata2k01\data\Planning\MPO-RPO\Franklin County\Franklin MPO Meetings\Frankin MPO 2025 Meetings\August 2025\Statewide\FCC278 - D8 PRTCT MPMS 121390 PE Add - mpl
FISCAL CONSTRAINT CHART
FFY 2025-2028 TIP Highway/Bridge
Project Title MPMS Phase Amts Fed State Federal State Loc/Oth Federal State Loc/Oth Federal State Loc/Oth Federal State Loc/Oth
South Third St Crossing Before RRX 581 21,141 7,500
/RRX Adjust RRX 581 (21,141)
Franklin After RRX 581 7,500
RRX Reserve Before RRX 422,495
/Adjust RRX 21,141
Central Office After RRX 443,636
$443,636 $7,500 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$443,636 $7,500 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Remarks
Administrative Action (MA ID:141289)
Statewide and Franklin TIPs Fund Type FFY 2025 FFY 2026 FFY 2027 FFY 2028
NOTES
102974 CON
Funds returned to line item due to
unauthorized construction. Cannot be
reinbursed with federal funding.
98255 CON
Funds returned to Statewide RRX
Reserve to maintain fiscal constraint.
Before Totals
Adjustment Totals
After Totals
Actions do not affect air quality
conformity.