Loading...
HomeMy WebLinkAbout2025.8.21 Policy Board Meeting Packet Franklin County Planning Department 272 North Second Street Chambersburg, PA 17201 Phone: 717-261-3855 Fax: 717-264-8667 Email: planning@franklincountypa.gov FRANKLIN COUNTY METROPOLITAN PLANNING ORGANIZATION POLICY BOARD MEETING August 21, 2025 – 10:00 am Franklin County Administrative Building, Room 824 272 North 2nd Street Chambersburg, PA 17201 Video call link: https://meet.google.com/ueq-ukui-tkc Or dial: 3539-702-346US) +1 ( PIN: 617 284 298 # I. Welcome and Introduction – Sam Cressler II. Moment of Silence III. Pledge of Allegiance IV. Approval of Meeting Minutes – May 15, 2025 – Action V. Business a. 2025-2028 TIP Modifications – Discussion b. 2027-2030 TIP Development - Discussion c. MPO On-Call Consultant RFP – Discussion d. TASA Update - Presentation VI. Partner Updates a. Commute PA Update b. Rabbittransit Update c. PennDOT Update d. FHWA Update e. State/Federal Legislative Update f. Director’s Report – Quentin Clapper g. Staff Report – Matthew Romero VII. Future Meetings a. November 20 – Policy Board Meeting 10:00 A.M. VIII. Public Comment IX. Adjournment “The FCMPO is committed to complying with the nondiscrimination requirements of the Title VI of the Civil Rights Act of 1964 and related statutes and regulations prohibiting discrimination in all programs and activities. All locations for meetings open to the public will be accessible to persons with disabilities. With advance notification, accommodations may be provided for those with special needs related to language, speech, sight, or hearing. If you have a request for a special need, wish to file a complaint, or desire additional information, please contact the Franklin County Planning Department at (717) 261-3855; FAX (717) 264-8667; email: planning@franklincountypa.gov.” DRAFT DRAFT 1 Franklin MPO Meeting Project Updates August 2025 Meeting Project Description West King Street Bridge ECMS # 19304 SR-Section 11-095 Contractor J.D. Eckman, Inc. Original Contract Value $12,877,625.31 NTP date 12/9/2024 Original Completion Date 11/14/2028 Project Scope This project consists of a bridge replacement on SR 0011 (West King Street) over Norfolk Southern Railroad and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0011, SECTION 095, in FRANKLIN COUNTY, SOUTHAMPTON TOWNSHIP and SHIPPENSBURG BOROUGH, from Segment 0540 Offset 3134 to Segment 0560 Offset 0111, for an overall project length of 1,164.00 linear feet (0.306 mile). Previous Update • We are still coordinating with Norfolk Southern Railroad to begin work. • Utility coordination meetings have begun and Brightspeed has not started any of their prior work. • Contractor wishes to start Spring/Summer of 2025 if all Utilities and Railroad cooperate. • Without Railroad coordination and utility relocations, physical work will begin in Spring 2026. Project Update • Coordination efforts are still on going with Norfolk Southern Railroad and very little progress has been made. • Utility coordination has begun. Brightspeed installed new utility poles. Tree trimming needs performed prior to aerial relocations but currently no one has permission to perform any work on Railroad right-of- way. • Physical work on bridge expected to start in Spring 2026. • Project is just past the half- way mark of the built-in one year coordination period at the beginning of the project. Project Description PA997 & SR2015 Intersection ECMS # 106709 SR-Section 997-037 Contractor Mitchell Knorr dba Mitchell Knorr Contracting Original Contract Value $6,224,217.92 2 NTP date 3/3/2025 Original Completion Date 8/22/2028 Project Scope This project is for roadway widening, roundabout construction, ADA curb ramps, drainage improvements, stormwater management, lighting, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0997, SECTION 037, and for STATE ROUTE 2015, SECTION 009, in FRANKLIN COUNTY, WASHINGTON TOWNSHIP, from 800 feet south of SR 2015 (Orchard Road/Tomstown Road) at Segment 0100 Offset 0098 to 1500 feet north of SR 2015 (Orchard Road/Tomstown Road) at Segment 0110 Offset 0676. Previous Update • Contractor started excavating for Post-Construction Stormwater Control Measures, vegetated swales and drainage pipes. • Temporary concrete barrier has been installed along SR997. • Utilities have begun their relocations. • Contractor plans to implement detour to Tomstown Road (local road) in the near future. • No project delays or overruns at this time. Project Update • Contractor excavated for Post-Construction Stormwater Control Measures, vegetated swales and drainage pipes. • Utilities remain to be relocated but are progressing. • Contractor is able to avoid delays and inefficiencies while staying busy with various contract work items until all utility relocations are completed. • Tomstown Road (local road) remains closed and has provided a safety improvement by reducing the intersection from four legs down to three. • Project has not experienced any major overruns or delays at this time. Project Description I-81 Maryland to Mile 6 ECMS # 92006 SR-Section 81-099 Contractor New Enterprise Stone and Lime Co. Inc. Original Contract Value $17,840,777.77 NTP date 3/24/2025 Original Completion Date 7/16/2027 3 Project Scope This project consists of milling, concrete patching, asphalt resurfacing, guiderail updates, signage, and pavement markings on I-81 Northbound and Southbound from the Maryland State Line to Milepost 6, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0081, SECTION 099, in FRANKLIN COUNTY, ANTRIM TOWNSHIP, from Segment 0002 Offset 0000 and Segment 0003 Offset 0000 to Segment 0060 Offset 1831 and Segment 0061 Offset 1831, including adjacent interchange ramps SR 8001, SR 8003, and SR 8005, for an overall project length of 33,543.00 linear feet (6.35 miles). Previous Update • Contractor scheduled to begin work Sunday evening May 11, 2025. • Milling and removal of existing blacktop will take place first followed by full and partial depth concrete patching and then placement of asphalt binder course and stone matrix asphalt wearing course. • Nightly lane closures will take place from 7PM to 6AM Sunday night through Thursday night with Friday night as a rain makeup. • Work this year will be from mile markers 3 to 6 Northbound and Southbound. • Work at Maryland state line will take place next year from state line to mile marker 3 North and South. • Contractor has requested and received permission to reduce speed limit from 65MPH to 55MPH during work hours. • State Police and Automated Work Zone Speed Enforcement will be utilized. Project Update • Contractor has placed 19mm asphalt binder course on travel lanes southbound from mile marker 6 to mile marker 3. • Sunday evening August 3, 2025, concrete crews began full and partial depth patching on northbound side from mile marker 3 to mile marker 6. • Project is moving along as planned except for rain and weather delays. No significant overruns or delays at this time. Project Description Fort Loudon Rd Resurface 2 ECMS # 90995 SR-Section 75-014 Contractor Cottle's Asphalt Maintenance, Inc. Original Contract Value $2,290,908.74 NTP date 8/4/2025 Original Completion Date 8/13/2027 4 Project Scope This project consists of work on SR 0075-014 with resurfacing the existing roadway and shoulder using Superpave wearing and scratch courses, milling in curbed areas and near structures, base replacement, minor drainage improvements, and guide rail replacement along with other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 0075, SECTION 014, in FRANKLIN COUNTY, MONTGOMERY TOWNSHIP and MERCERSBURG BOROUGH, from SR 0995, Welsh Run Road at Segment 0070 Offset 0541 in Montgomery Township to Buchanan Trail W in Mercersburg Borough at Segment 0160 Offset 1427, for an overall project length of 21,879.66 linear feet (4.14 miles). Project Update • Pre-construction meeting was on Monday August 4, 2025. • No physical work expected to start this year. Project Description Chambersburg Signals Improvement Phase 2 ECMS # 116146 SR-Section 11-125 Contractor Bruce - Merrilees Electric Company Original Contract Value $398,120.49 NTP date 9/8/2025 Original Completion Date 7/28/2026 Project Scope This project consists of Signal Improvements at 65 intersections in various locations to include: radar detection, software updates, signal optimization/retiming, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0011, SECTION 125, in FRANKLIN COUNTY, CHAMBERSBURG BOROUGH and GREENE, HAMILTON, & GUILFORD TOWNSHIPS, from Segment 0220 Offset 0700 to Segment 0370 Offset 2400. Project Update • Working on scheduling the pre-construction meeting with Contractor and Chambersburg Borough. FFY 2025-2028 TIP MODIFICATIONS FORM Item Project Title MPMS Ph Prog Fed Sta.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc. Social Island Road Bridge-C Before BOF 314,000 186,000 Before PRTCT 750,000 3012/027 Adjust BOF -314,000 -186,000 Adjust PRTCT After Franklin After PRTCT 750,000 Social Island Road Bridge-C Before BOF 80,000 Before PRTCT 109,000 3012/027 Adjust BOF -80,000 Adjust PRTCT After Franklin After PRTCT 109,000 Social Island Road Bridge-C Before BOF 70,000 Before PRTCT 109,000 3012/027 Adjust BOF -70,000 Adjust PRTCT After Franklin After PRTCT 109,000 Franklin Bridge Reserve Before BRIP 47,731 200,874 Before BOF 1,889 Adjust BRIP Adjust BOF 314,000 336,000 After BRIP 47,731 200,874 Franklin After BOF 314,000 337,889 1 Decreasing the FD phase of Social Island Road Bridge-C for $500,000 in FFY 2025/2026 to the current estimate. Statewide PROTECT funds are replacing the Franklin TIP funds. This project may consist of a bridge improvement (replacement, rehabilitation or preservation) on SR 3012 (Social Island Road) over Conococheague Creek in Guilford and Hamilton Townships, Franklin County. This project has a current estimated let date of Dec. 10, 2026. 2 90969 UTL Decreasing the UTL phase of Social Island Road Bridge-C for $80,000 in FFY 2026 to the current estimate. Statewide PROTECT funds are replacing the Franklin TIP funds. This project may consist of a bridge improvement (replacement, rehabilitation or preservation) on SR 3012 (Social Island Road) over Conococheague Creek in Guilford and Hamilton Townships, Franklin County. This project has a current estimated let date of Dec. 10, 2026. 3 90969 ROW Decreasing the ROW phase of Social Island Road Bridge-C for $70,000 in FFY 2026 to the current estimate. Statewide PROTECT funds are replacing the Franklin TIP funds. This project may consist of a bridge improvement (replacement, rehabilitation or preservation) on SR 3012 (Social Island Road) over Conococheague Creek in Guilford and Hamilton Townships, Franklin County. This project has a current estimated let date of Dec. 10, 2026. 4 87804 CON 90969 FD Informed Coordinating Committee: 8/21/2025 Informed Technical Committee: N/A FFY 2029 - FFY 2036 Remarks Franklin MPO Administrative Modification - Highway Funds FFY 2026FFY 2025 FFY 2027 FFY 2028 This is a reserve line item. FFY 2025-2028 TIP MODIFICATIONS FORM Item Project Title MPMS Ph Prog Fed Sta.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc. FFY 2029 - FFY 2036 RemarksAdministrative Modification - Highway Funds FFY 2026FFY 2025 FFY 2027 FFY 2028 Swamp Fox Rd over I-81 Before 914/003 Adjust BRIP 159,000 Franklin After BRIP 159,000 Swamp Fox Rd over I-81 Before BRIP 240,000 914/003 Adjust BRIP -99,000 99,000 Franklin After BRIP 141,000 99,000 Swamp Fox Rd over I-81 Before BRIP 40,000 914/003 Adjust BRIP -40,000 40,000 Franklin After BRIP 40,000 Swamp Fox Rd over I-81 Before BRIP 20,000 914/003 Adjust BRIP -20,000 20,000 Franklin After BRIP 20,000 Franklin Bridge Reserve Before BRIP 47,731 200,874 Before BOF 314,000 337,889 Adjust BRIP -159,000 Adjust BOF After BRIP 47,731 41,874 Franklin After BOF 314,000 337,889 This is a reserve line item. 9 87804 CON 117156 ROW 5 117156 PE Cashflowing the ROW phase of Swamp Fox Rd over I-81 for $20,000 from FFY 2025 to FFY 2026 to better align with the current schedule. This project may consist of a bridge improvement (replacement, rehabilitation or preservation) on PA 914 (Swamp Fox Road) over I-81 in Guilford Township, Franklin County. This project has a current estimated let date of March 25, 2027. 8 7 117156 UTL 6 117156 FD Adding the PE phase of Swamp Fox Rd over I-81 for $159,000 in FFY 2025 to convert advance construct funds to the current estimate. This project may consist of a bridge improvement (replacement, rehabilitation or preservation) on PA 914 (Swamp Fox Road) over I-81 in Guilford Township, Franklin County. This project has a current estimated let date of March 25, 2027. Cashflowing the UTL phase of Swamp Fox Rd over I-81 for $40,000 from FFY 2025 to FFY 2026 to better align with the current schedule. This project may consist of a bridge improvement (replacement, rehabilitation or preservation) on PA 914 (Swamp Fox Road) over I-81 in Guilford Township, Franklin County. This project has a current estimated let date of March 25, 2027. Cashflowing the FD phase of Swamp Fox Rd over I-81 for $99,000 from FFY 2025 to FFY 2026 to better align with the current schedule. This project may consist of a bridge improvement (replacement, rehabilitation or preservation) on PA 914 (Swamp Fox Road) over I-81 in Guilford Township, Franklin County. This project has a current estimated let date of March 25, 2027. FFY 2025-2028 TIP MODIFICATIONS FORM Item Project Title MPMS Ph Prog Fed Sta.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc. FFY 2029 - FFY 2036 RemarksAdministrative Modification - Highway Funds FFY 2026FFY 2025 FFY 2027 FFY 2028 US 30 Bridge over W Br Conococheaugue Creek Before BRIP 75,000 30/158 Adjust BRIP -75,000 Franklin After US 30 Bridge over W Br Conococheaugue Creek Before 581 1,520,000 1,520,000 30/158 Adjust 581 -920,000 -1,520,000 Franklin After 581 600,000 Franklin Bridge Reserve Before BRIP 47,731 41,874 Before BOF 314,000 337,889 Adjust BRIP 75,000 Adjust BOF After BRIP 47,731 116,874 Franklin After BOF 314,000 337,889 Highway Reserve Before STP 581 744,595 14,645 646,416 485,243 1,472,881 2,740,030 Adjust STP 581 920,000 1,520,000 Franklin After STP 581 744,595 14,645 646,416 485,243 2,392,881 4,260,030 This is a reserve line item. This is a reserve line item. 12 87804 CON 13 10 117144 UTL 11 117144 CON Removing the UTL phase of US 30 Bridge over W Br Conococheaugue Creek for $75,000 in FFY 2026 due to no utility relocations. This project may consist of a bridge improvement (replacement, rehabilitation or preservation) on US 30 (Lincoln Highway) over the West Branch Conococheague Creek in Peters Township, Franklin County. This project has a current estimated let date of Nov. 5, 2026. Decreasing the CON phase of US 30 Bridge over W Br Conococheaugue Creek for $2,440,000 in FFY 2027/2028 to the current estimate for joint work and scour protection. This project may consist of a bridge improvement (replacement, rehabilitation or preservation) on US 30 (Lincoln Highway) over the West Branch Conococheague Creek in Peters Township, Franklin County. This project has a current estimated let date of Nov. 5, 2026. 87805 CON FFY 2025-2028 TIP MODIFICATIONS FORM Item Project Title MPMS Ph Prog Fed Sta.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc. FFY 2029 - FFY 2036 RemarksAdministrative Modification - Highway Funds FFY 2026FFY 2025 FFY 2027 FFY 2028 Fort Loudon Rd ov Buck Run Before 75/013 Adjust BRIP 26,046 Franklin After BRIP 26,046 Fort Loudon Rd ov Buck Run Before 185 230,000 75/013 Adjust 185 79,000 Franklin After 185 230,000 79,000 Fort Loudon Rd ov Buck Run Before 185 513,872 380,987 Before 581 591,289 75/013 Adjust 185 -79,000 Adjust 581 210,852 After 185 434,872 380,987 Franklin After 581 802,141 Franklin Bridge Reserve Before BRIP 47,731 116,874 Before BOF 314,000 337,889 Adjust BRIP -26,046 Adjust BOF After BRIP 21,685 116,874 Franklin After BOF 314,000 337,889 Highway Reserve Before STP 581 744,595 14,645 646,416 485,243 2,392,881 4,260,030 Adjust STP 581 -210,852 Franklin After STP 581 744,595 14,645 646,416 485,243 2,182,029 4,260,030 18 87805 CON This is a reserve line item. This is a reserve line item. 17 87804 CON Increasing the PE phase of Fort Loudon Rd ov Buck Run for $26,046 in FFY 2025 for additional scope of work needed to complete Preliminary Engineering. This project may consist of a bridge improvement (replacement, rehabilitation or preservation) on US 30 (Lincoln Highway) over the West Branch Conococheague Creek in Peters Township, Franklin County. This project has a current estimated let date of Sept. 17, 2026. 7869016 CON Increasing and cashflowing the CON phase of Fort Loudon Rd ov Buck Run for $210,852 in FFY 2026/2027 to the current estimate. This project may consist of a bridge improvement (replacement, rehabilitation or preservation) on US 30 (Lincoln Highway) over the West Branch Conococheague Creek in Peters Township, Franklin County. This project has a current estimated let date of Sept. 17, 2026. 15 78690 FD Increasing the FD phase of Fort Loudon Rd ov Buck Run for $79,000 in FFY 2026 to the current estimate. This project may consist of a bridge improvement (replacement, rehabilitation or preservation) on US 30 (Lincoln Highway) over the West Branch Conococheague Creek in Peters Township, Franklin County. This project has a current estimated let date of Sept. 17, 2026. 14 78690 PE FFY 2025-2028 TIP MODIFICATIONS FORM Item Project Title MPMS Ph Prog Fed Sta.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc. FFY 2029 - FFY 2036 RemarksAdministrative Modification - Highway Funds FFY 2026FFY 2025 FFY 2027 FFY 2028 Corner Road over Licking Cr Before BOF 274,000 3009/022 Adjust BOF 30,000 Franklin After BOF 304,000 Corner Road over Licking Cr Before 3009/022 Adjust BOF 30,000 Franklin After BOF 30,000 Corner Road over Licking Cr Before BRIP 1,156,126 Before 3009/022 Adjust BRIP Adjust STP 237,874 After BRIP 1,156,126 Franklin After STP 237,874 Franklin Bridge Reserve Before BRIP 21,685 116,874 Before BOF 254,000 337,889 Adjust BRIP Adjust BOF -60,000 After BRIP 21,685 116,874 Franklin After BOF 194,000 337,889 Highway Reserve Before STP 581 744,595 14,645 646,416 247,369 2,182,029 4,260,030 Adjust STP 581 -237,874 Franklin After STP 581 744,595 14,645 646,416 9,495 2,182,029 4,260,030 ROW Increasing the FD phase of Corner Road over Licking Cr for $30,000 in FFY 2025 to the current estimate. This project consists of a bridge rehabilitation on SR 3009 (Corner Road) over Licking Creek in Montgomery Township, Franklin County. This project has a current estimated let date of Sept. 17, 2026. Adding the ROW phase of Corner Road over Licking Cr for $30,000 in FFY 2025 to the current estimate. This project consists of a bridge rehabilitation on SR 3009 (Corner Road) over Licking Creek in Montgomery Township, Franklin County. This project has a current estimated let date of Sept. 17, 2026. 21 116963 CON Increasing the CON phase of Corner Road over Licking Cr for $237,874 in FFY 2027 to the current estimate. This project consists of a bridge rehabilitation on SR 3009 (Corner Road) over Licking Creek in Montgomery Township, Franklin County. This project has a current estimated let date of Sept. 17, 2026. 23 87805 CON 19 116963 FD 20 116963 This is a reserve line item. 22 87804 This is a reserve line item. CON FFY 2025-2028 TIP MODIFICATIONS FORM Item Project Title MPMS Ph Prog Fed Sta.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc. FFY 2029 - FFY 2036 RemarksAdministrative Modification - Highway Funds FFY 2026FFY 2025 FFY 2027 FFY 2028 PA997 & SR2015 Intersection Before HSIP 1,271,000 1,301,000 1,301,000 449,383 Before STP 726,486 619,000 214,757 1,041,535 997/037 Adjust HSIP Adjust STP 619,000 -619,000 After HSIP 1,271,000 1,301,000 449,383 Franklin After STP 1,345,486 214,757 1,041,535 Highway Reserve Before STP 581 744,595 14,645 646,416 247,369 2,182,029 4,260,030 Adjust STP 581 -619,000 619,000 Franklin After STP 581 125,595 14,645 1,265,416 247,369 2,182,029 4,260,030 CON 24 106709 CON 25 87805 This is a reserve line item. Cashflowing the CON phase of PA997 & SR2015 Intersection for $619,000 from FFY 2026 to FFY 2025 to better utilize current available funding. This project consists of installing two roundabouts at the intersection of PA997 and SR2015 (Tomstown Road) and the intersection of PA997 and Washington Township Boulevard in Washington Township, Franklin County. This project was let on Jan. 16, 2025. FFY 2025-2028 TIP MODIFICATIONS FORM Item Project Title MPMS Ph Prog Fed Sta.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc. FFY 2029 - FFY 2036 RemarksAdministrative Modification - Highway Funds FFY 2026FFY 2025 FFY 2027 FFY 2028 Chambersburg Signals Imp Phase 2 Before CRP 356,060 169,940 Before CRPU 135,000 18,770 11/125 Adjust CRP -33,221 -169,940 Adjust CRPU -18,770 After CRP 322,839 Franklin After CRPU 135,000 Carbon Reduction Program (CRP) Chambersburg RSL Before CRP 370,060 540,000 540,000 Adjust CRP 33,221 169,940 Franklin After CRP 33,221 540,000 540,000 540,000 Carbon Reduction Program (CRP) Hagerstown RSL Before CRPU 119,230 138,000 138,000 Adjust CRPU 18,770 Franklin After CRPU 138,000 138,000 138,000 7,763,535 288,580 0 9,749,605 513,872 0 3,658,981 10,341,109 0 2,168,918 17,421,107 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 07,763,535 288,580 0 9,749,605 513,872 0 2,357,981 10,341,109 0 2,168,918 17,421,107 0 0 0 0After FFY Totals Before FFY Totals Program Summary - Net Changes Adjustments 26 116146 CON Decreasing the CON phase of Chambersburg Signals Imp Phase 2 for $221,931 in FFY 2025/2026 to the low bid amount. This project consists of upgrades of signals and interconnect improvements at 65 signalized intersections in Chambersburg Borough, Guilford and Hamilton Townships, Franklin County. These signal timing improvements aim to reduce vehicle stops and delays, reduce congestion, and improve air quality. This project was let on July 10, 2025. This is a reserve line item. This is a reserve line item. 27 119286 CON 28 119287 CON FISCAL CONSTRAINT CHART FFY 2025-2028 TIP Highway/Bridge Project Title MPMS Phase Amts Fed State Federal State Loc/Oth Federal State Loc/Oth Federal State Loc/Oth Federal State Loc/Oth PROTECT Reserve Before PRTCT 114,400 425,415 55,075,900 62,639,000 /Adjust PRTCT (38,233) Central Office After PRTCT 76,167 425,415 55,075,900 62,639,000 SR 16 Retaining Wall Before 16/056 Adjust PRTCT 38,233 Franklin After PRTCT 38,233 $114,400 $0 $0 $425,415 $0 $0 $55,075,900 $0 $0 $62,639,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $114,400 $0 $0 $425,415 $0 $0 $55,075,900 $0 $0 $62,639,000 $0 $0 Remarks Administrative Action (MA ID: 140579) Statewide & Franklin TIPs Fund Type FFY 2025 FFY 2026 FFY 2027 FFY 2028 NOTES 118322 CON PROTECT Reserve line item used as source of funds to maintain fiscal constraint. 121390 PE Adding PE phase to cover unexpected Right of Way services and additional geotechnical effort. Before Totals Adjustment Totals After Totals Actions do not affect air quality conformity. \\pdkbdata2k01\data\Planning\MPO-RPO\Franklin County\Franklin MPO Meetings\Frankin MPO 2025 Meetings\August 2025\Statewide\FCC278 - D8 PRTCT MPMS 121390 PE Add - mpl FISCAL CONSTRAINT CHART FFY 2025-2028 TIP Highway/Bridge Project Title MPMS Phase Amts Fed State Federal State Loc/Oth Federal State Loc/Oth Federal State Loc/Oth Federal State Loc/Oth South Third St Crossing Before RRX 581 21,141 7,500 /RRX Adjust RRX 581 (21,141) Franklin After RRX 581 7,500 RRX Reserve Before RRX 422,495 /Adjust RRX 21,141 Central Office After RRX 443,636 $443,636 $7,500 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $443,636 $7,500 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Remarks Administrative Action (MA ID:141289) Statewide and Franklin TIPs Fund Type FFY 2025 FFY 2026 FFY 2027 FFY 2028 NOTES 102974 CON Funds returned to line item due to unauthorized construction. Cannot be reinbursed with federal funding. 98255 CON Funds returned to Statewide RRX Reserve to maintain fiscal constraint. Before Totals Adjustment Totals After Totals Actions do not affect air quality conformity. \\pdkbdata2k01\data\Planning\MPO-RPO\Franklin County\Franklin MPO Meetings\Frankin MPO 2025 Meetings\August 2025\Statewide\FCC322 - D8 RRX MPMS 102974 CON decrease - wjh