FRANKLIN COUNTY METROPOLITAN PLANNING ORGANIZATION
POLICY BOARD MEETING
May 21, 2026 – 10:00 am
Franklin County Administrative Building, Room 824
272 North 2nd Street
Chambersburg, PA 17201
Video call link here
Meeting ID: 290 243 155 661 69 Passcode: LW7Dn7fy
Or dial: 4202-489-233US) +1 ( PIN:
81984948#
I. Welcome and Introduction – Sam Cressler
II. Moment of Silence
III. Pledge of Allegiance
IV. Approval of Meeting Minutes – May 21, 2026 – Action
V. Business
a. 2027-20230 Draft Transportation Improvement Program Discussion:
• Response to Comments Received
• Air Quality Conformity Determination Report – Action
• Air Quality Conformity Resolution - Action
• TIP Resolution – Action
• TIP/STIP Memorandum of Understanding – Action
• 2027-2030 Draft Transportation Improvement Program Adoption – Action
• MPO Self-Certification – Action
b. 2025-2028 TIP Modifications - Informational
VI. Partner Updates
a. Commute PA Update
b. Rabbittransit Update
c. PennDOT Update
d. FHWA Update
e. State/Federal Legislative Update
f. Director’s Report – Quentin Clapper
g. Staff Report – Matthew Romero
VII. Future Meetings
a. August 20th – Policy Board Meeting 10:00 A.M.
VIII. Public Comment
IX. Adjournment
“The FCMPO is committed to complying with the nondiscrimination requirements of the Title VI
of the Civil Rights Act of 1964 and related statutes and regulations prohibiting discrimination in
all programs and activities. All locations for meetings open to the public will be accessible to
persons with disabilities. With advance notification, accommodations may be provided for those
with special needs related to language, speech, sight, or hearing. If you have a request for a special
need, wish to file a complaint, or desire additional information, please contact the Franklin County
Planning Department at (717) 261-3855; FAX (717) 264-8667; email:
planning@franklincountypa.gov.”
FRANKLIN COUNTY METROPOLITAN PLANNING ORGANIZATION
POLICY BOARD MEETING
February 19, 2026– 10:00 am
Franklin County Administrative Building, Room 824
272 North 2nd Street
Chambersburg, PA 17201
Video call link: https://teams.microsoft.com/l/meetup-join
Meeting ID: 290 243 155 661 69 Passcode: LW7Dn7fy
Or dial: (US) +1 323-489-4202 PIN: 81984948#
Meeting Minutes
Members in Attendance: Sam Cressler, Carey Mullins, Richard Reisinger, Nate Walker, Jason
Stains, Humaira Nabeela(v), Beth Nidham (v) David Mackley, Jeff Puher (v), Guy Shaul (v), Phil
Wolgemuth, Laura Helman(v), David Juba(v), Jeffrey Roecker(v), Jesse McMath and, Dean
Horst, John Flannery, Robert Ziobrowski and Sharon Coffman.
Staff in Attendance: Quentin Clapper, Colleen Tidd, and Matthew Romero
I.Welcome and Introduction – Sam Cressler
II.Moment of Silence
III.Pledge of Allegiance
IV.Election of Officers
a.Chair- Robert nominates Sam and Dean seconds. Motion carried.
b.Vice-Chair- Robert nominates Jason and Dean seconds. Motion carried
c.Secretary- Robert nominates Quentin and David seconds. Motion carried.
V.Approval of Meeting Minutes – November 20, 2025 – Action
a.Richard motions and Robert seconds. Motion carried.
VI.Business
a.2025-2028 TIP Modifications – Informational
•No Questions
b.PM1 Safety Target Review – Discussion
•Sam
•Concerns that 81 keeps coming and going from the TIP
•Conversations with Fetterman
Franklin County Planning Department
272 North Second Street
Chambersburg, PA 17201
Phone: 717-261-3855
Fax: 717-264-8667
Email: planning@franklincountypa.gov
DRA
F
T
•Nate Walker gives an overview on PM1
c.2025-2027 UPWP Task V Administrative Amendment – Action
•Quentin- PennDOT would like us to include language for future design. Recommends
approval of the amendment subject to revision. Include clarifying language under
number 5 on amendment.
•Sam asks if we can wait until next meeting
•If we wait it will be difficult to get the process fully improved and less time to
spend down.
•Robert motions and Sharon seconds. Motion carried.ci.2027-2030 TIP Development – Discussion
•Draft entering analysis stage
•Ready for adoption in May
cii.2027 LRTP Work Order – Action
•Robert motions and Jason seconds. Motion carried.
VII.Partner Updates (updates in meeting packet to add later)
a.Commute PA Update
•Laura
b.Rabbittransit Update
•Beth and David
c.PennDOT Update
•District 8-0 gave updates to ongoing projects.
•Robert asks when construction starts/completes/full interchange?
•3 yrs for construction. Full interchange (on and off ramps)
•Sam- concerned over flaggers not scheduled appropriately (lack of)
•Nabeela Gives Update
•2026 Behavioral Health Survey through PennDOT
d.FHWA Update
•No Updates
e.State/Federal Legislative Update
•No Updates
f.Director’s Report – Quentin Clapper
•Quentin provided general planning updates.
g.Staff Report – Matthew Romero
h.Sam Updates
•Trail from university to Orrstown rd. – Additional 1.3 miles
•Robert asks if funds have been allocated and will there be parking.
•DCNR covering planning and TASA covering construction costs.
In-house funding as well. There will be parking.
DRA
F
T
VIII. Future Meetings
a. May 21 – Policy Board Meeting 10:00 A.M.
IX. Public Comment
a. No public comment
X. Adjournment
a. David Motions and Sharon seconds.
“The FCMPO is committed to complying with the nondiscrimination requirements of the Title
VI of the Civil Rights Act of 1964 and related statutes and regulations prohibiting
discrimination in all programs and activities. All locations for meetings open to the public
will be accessible to persons with disabilities. With advance notification, accommodations
may be provided for those with special needs related to language, speech, sight, or hearing. If
you have a request for a special need, wish to file a complaint, or desire additional information,
please contact the Franklin County Planning Department at (717) 261-3855; FAX (717) 264-
8667; email: planning@franklincountypa.gov.”
5
DRA
F
T
FFY 2025-2028 TIP MODIFICATIONS FORM
Item #Project Title MPMS #Phase Prog Fed Sta.Fed Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.
Delivery/Consult Assist Before 581 400,000 400,000
Before
Adjust 581
Adjust 185 10,000
After 581 400,000 400,000
Franklin After 185 10,000
I-81 New Interchange (Exit 12)Before NHPP 185 780,780 222,470 588,780 1,338,000
Before sNHPP 581 1,932,021 3,744,048 10,000,000 10,000,000
Before
Adjust NHPP 185 -6,397
81/075 Adjust sNHPP 581
Adjust STP 6,397
After NHPP 185 780,780 216,073 588,780 1,338,000
After sNHPP 581 1,932,021 3,744,048 10,000,000 10,000,000
Franklin After STP 6,397
Bridge Reserve Before BOF 185 3,603
Before BRIP 370,084
Adjust BOF 185 -3,603
Adjust BRIP
After BOF 185
Franklin After BRIP 370,084
Highway Reserve Before STP 581 14,645 26,961 868,900 2,182,029 1,364,278 3,561,218
Before NHPP 891,220
Adjust STP 581 -6,397
Adjust NHPP
After STP 581 14,645 20,564 868,900 2,182,029 1,364,278 3,561,218
Franklin After NHPP 891,220
Franklin MPO
FFY 2025 FFY 2027FFY 2026 FFY 2028Funds Administrative Modification - Highway & Bridge
Informed Coordinating Committee: 2/19/26
Informed Technical Committee: N/A
Remarks
PE1
This is a reserve line item.
87810
This is a reserve line item.
CON87805
2
Changing the funding type for the CON phase of I-81 New Interchange (Exit 12) in FFY
2026 for $6,397 to better utilize current available funding. This incorporated utility work is
now part of the bid for construction. This project consists of a new interchange (Exit 12) on I-
81 at Guilford Springs Road overpass, Franklin County. Guilford Springs Road is a township
road and the bridge over I-81 is a state-owned bridge. This project has a current estimated
let date of May 21, 2026.
CON93055
This is a reserve line item.
CON878043
4
FFY 2025-2028 TIP MODIFICATIONS FORM
Item #Project Title MPMS #Phase Prog Fed Sta.Fed Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.
FFY 2025 FFY 2027FFY 2026 FFY 2028Funds Administrative Modification - Highway & Bridge
Remarks
Fort Loudon Rd ov Buck Run Before 185 230,000 79,000
75/013 Adjust 185 8,238
Franklin After 185 230,000 87,238
Rolling Rd ov Tributary to Back Ck Before 185 125,000 125,000
3028/007 Adjust 185 39,543
Franklin After 185 164,543 125,000
I-81 New Interchange (Exit 12)Before NHPP 185 780,780 216,073 588,780 1,338,000
Before sNHPP 581 1,932,021 3,744,048 10,000,000 10,000,000
Before
Adjust NHPP 185 -47,781 47,781
81/075 Adjust sNHPP 581
Adjust STP
After NHPP 185 780,780 168,292 636,561 1,338,000
After sNHPP 581 1,932,021 3,744,048 10,000,000 10,000,000
Franklin After STP
Highway Reserve Before STP 581 14,645 20,564 868,900 2,182,029 1,364,278 3,561,218
Before NHPP 891,220
Adjust STP 581
Adjust NHPP -47,781
After STP 581 14,645 20,564 868,900 2,182,029 1,364,278 3,561,218
Franklin After NHPP 843,439
CON
This is a reserve line item.
8 87805
Cashflowing and changing the funding type for the CON phase of I-81 New Interchange
(Exit 12) from FFY 2026 to FFY 2027 for $47,781 to better utilize current available
funding. This incorporated utility work is now part of the bid for construction. This project
consists of a new interchange (Exit 12) on I-81 at Guilford Springs Road overpass, Franklin
County. Guilford Springs Road is a township road and the bridge over I-81 is a state-owned
bridge. This project has a current estimated let date of May 21, 2026.
CON930557
117141
FD78690
6
5
Increasing the FD phase of Rolling Rd ov Tributary to Back Ck in FFY 2026 for $39,543 to
the current estimate. This project may consist of a bridge improvement (replacement,
rehabilitation or preservation) on SR 3028 (Rolling Road) over tributary to Back Creek in
Saint Thomas Township, Franklin County. This project has a current estimated let date of
April 8, 2027.
Increasing the FD phase of Fort Loudon Rd ov Buck Run in FFY 2026 for $8,238 to
complete an updated PNDI and bat survey. This project consists of a bridge rehabilitation on
PA 75 (Fort Loudon Road) over Buck Run in Peters Township, Franklin County. This
project has a current estimated let date of April 29, 2027.
FD
FFY 2025-2028 TIP MODIFICATIONS FORM
Item #Project Title MPMS #Phase Prog Fed Sta.Fed Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.
FFY 2025 FFY 2027FFY 2026 FFY 2028Funds Administrative Modification - Highway & Bridge
Remarks
Chambersburg Signals Imp Phase 2 Before CRP 322,839
Before CRPU 135,000
11/125 Adjust CRP 96,710
Adjust CRPU
After CRP 322,839 96,710
Franklin After CRPU 135,000
Carbon Reduction Program (CRP)
Chambersburg RSL Before CRP 33,221 540,000 540,000 540,000
Adjust CRP -96,710
Franklin After CRP 33,221 443,290 540,000 540,000
0 4,523,332 0 1,609,085 8,534,242 0 24,697,800 4,489,058 0 25,774,640 7,122,436 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 4,523,332 0 1,609,085 8,534,242 0 24,697,800 4,489,058 0 25,774,640 7,122,436 0After FFY Totals
9
Increasing the CON phase of Chambersburg Signals Imp Phase 2 in FFY 2026 for $96,710.
This is for materials and labor for new controller cabinets at 7 intersections. This project
consists of upgrades of signals and interconnect improvements at 65 signalized intersections
in Chambersburg Borough, Guilford and Hamilton Townships, Franklin County. This
project was let on July 10, 2025.
Before FFY Totals
Program Summary - Net Changes Adjustments
This is a reserve line item.
CON11928610
116146 CON
FISCAL CONSTRAINT CHART
FFY 2025-2028 TIP Highway/Bridge
Project Title MPMS Phase Amts Fed State Federal State Loc/Oth Federal State Loc/Oth Federal State Loc/Oth Federal State Loc/Oth
NHPP Reserve Before sNHPP 3,148,147 750,000 55,000
/Adjust sNHPP (55,000)
Central Office After sNHPP 3,093,147 750,000 55,000
Rocky Mountain Creek Br Before sNHPP TOLL 2,000,000 3,530,977
30/103 Adjust sNHPP TOLL 55,000
Franklin After sNHPP TOLL 2,000,000 3,585,977
$2,000,000 $0 $0 $6,679,124 $0 $0 $750,000 $0 $0 $55,000 $0 $0
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
$2,000,000 $0 $0 $6,679,124 $0 $0 $750,000 $0 $0 $55,000 $0 $0
State match provided via toll credits.
NOTES
102466 CON Line item used as funding source to
maintain fiscal constraint.
90839 CON-TOLL CON cost increase to match pre-bid
estimate. 5/7/2026 EST let date.
Before Totals
Adjustment Totals
After Totals
Actions do not affect air quality
conformity.
Remarks
Administrative Action (MA ID: 144717)
Statewide & Franklin (D8)Fund Type FFY 2025 FFY 2026 FFY 2027 FFY 2028
S:\Planning\MPO-RPO\Franklin County\Franklin MPO Meetings\Franklin MPO 2026 Meetings\May 2026\Statewide\FCC549-D8 sNHPP CON MPMS 90839 -mjc
FFY 2025-2028 TIP MODIFICATIONS FORM
Date: 5/11/2026
Page 1 of 1
Item Project Title MPMS Ph Prog Fed Sta.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.
Microtransit Service Before 5307 339
3,463,872 69,568 10,432 80,000 69,568 10,432
Adjust 5307 339
-465,464 465,464
After 5307 339
2,998,408 69,568 10,432 545,464 69,568 10,432
3,463,872 69,568 10,432 80,000 69,568 10,432 0 0 0 0 0 0
-465,464 0 0 465,464 0 0 0 0 0 0 0 0 0
2,998,408 69,568 10,432 545,464 69,568 10,432 0 0 0 0 0 0
1 121328 PT
Moving funds from FFY 2025 to FFY 2026 to
match grant application period.
After FFY Totals
Before FFY Totals
Program Summary - Net Changes Adjustments
Informed Coordinating Committee:
Informed Technical Committee:
Administrative Modification - Transit Funds
Remarks
FFY 2025 FFY 2026 FFY 2027 FFY 2028
Franklin MPO
Franklin MPO Meeting Project Updates
May 2026 Meeting
Project Description West King Street Bridge
ECMS # 19304
SR-Section 11-095
Contractor J.D. Eckman, Inc.
Original Contract Value $12,877,625.31
NTP date 12/9/2024
Original Completion Date 11/14/2028
Project Scope This project consists of a bridge replacement on SR 0011
(West King Street) over Norfolk Southern Railroad and other
miscellaneous construction, all as indicated on the approved
drawings included in the Bid Package for STATE ROUTE 0011,
SECTION 095, in FRANKLIN COUNTY, SOUTHAMPTON
TOWNSHIP and SHIPPENSBURG BOROUGH, from Segment
0540 Offset 3134 to Segment 0560 Offset 0111, for an overall
project length of 1,164.00 linear feet (0.306 mile).
on going with Norfolk Southern Railroad and very little
progress has been made. Right of entry agreement has been
completed but still do not have a railroad flagging agreement. Utility coordination and relocations have begun. New utility
poles have been installed and some aerial lines have been
transferred. Tree trimming within Norfolk Southern Right-of-
Project is currently working through an avenue to clear trees
within NS ROW. Physical work on bridge expected to start in
Spring 2026. The built-in one year coordination period expired in December 2025.
• Utility relocations are underway. All utility
companies have been responsive to requested updates and relocation meetings.
• Tree trimming was performed and aerial
relocations are underway.
• Coordination with Norfolk Southern Railroad is ongoing.
• Hopefully project will receive the green light to
begin construction in the coming weeks.
• Project is currently six months behind. Project
team is working diligently with Contractor to
mitigate all potential delay costs.
Project Description PA997 & SR2015 Intersection
ECMS # 106709
SR-Section 997-037
Contractor Mitchell Knorr dba Mitchell Knorr Contracting
Original Contract Value $6,224,217.92
NTP date 3/3/2025
Original Completion Date 8/22/2028
Project Scope This project is for roadway widening, roundabout construction,
ADA curb ramps, drainage improvements, stormwater
management, lighting, and other miscellaneous construction,
all as indicated on the approved drawings included in the Bid
Package for STATE ROUTE 0997, SECTION 037, and for STATE
ROUTE 2015, SECTION 009, in FRANKLIN COUNTY, WASHINGTON TOWNSHIP, from 800 feet south of SR 2015
(Orchard Road/Tomstown Road) at Segment 0100 Offset 0098
to 1500 feet north of SR 2015 (Orchard Road/Tomstown Road)
at Segment 0110 Offset 0676.
mid-March. Progress so far includes large quantities of
excavation for stormwater control features, installation of
drainage pipes, grading for new roadway and concrete curbs,
widening existing roadway and base course paving on Orchard
Road and 997. Project is on schedule with no major overruns
or delays.
• Project resumed construction in late March.
• Traffic recently switched over to stage two
sequence where it will remain for several
months.
• Contractor is currently placing concrete for curb
islands and gutters.
• Roadway grading is also taking place.
• Contractor working on subgrade, subbase and
base course installation.
•
Project Description I-81 Maryland to Mile 6
ECMS # 92006
SR-Section 81-099
Contractor New Enterprise Stone and Lime Co. Inc.
Original Contract Value $17,840,777.77
NTP date 3/24/2025
Original Completion Date 7/16/2027
Project Scope This project consists of milling, concrete patching, asphalt
resurfacing, guiderail updates, signage, and pavement markings on I-81 Northbound and Southbound from the
Maryland State Line to Milepost 6, all as indicated on the
approved drawings included in the Bid Package for STATE
ROUTE 0081, SECTION 099, in FRANKLIN COUNTY, ANTRIM
TOWNSHIP, from Segment 0002 Offset 0000 and Segment
0003 Offset 0000 to Segment 0060 Offset 1831 and Segment
0061 Offset 1831, including adjacent interchange ramps SR 8001, SR 8003, and SR 8005, for an overall project length of
33,543.00 linear feet (6.35 miles).
construction season, Contractor completed stone matrix
asphalt wearing course on North and South 81 from mile
marker 3 to mile marker 6. In 2026, work will take place at
the Maryland state line to mile marker 3 on North and South
81. Contractor will mill off existing asphalt down to the underlying concrete then build back up with concrete repairs,
binder course and wearing course. All guide rail, edge line
rumble strips and final pavement markings will be placed after
completion of all paving work. Project is on schedule with no
major overruns. Milling and paving quantities will be
monitored to mitigate the potential for significant overruns.
Project Update • Contractor has begun milling and paving
operations on Interstate 81 North and South from Maryland State Line to mile marker 3.
• This pavement section is the worst within
project limits.
• Extensive full and partial depth concrete repairs have been encountered southbound.
• Large quantity overruns will be needed to repair concrete prior to placing asphalt binder course.
• Project is on track to be finished by original
completion date but Project Team is working
diligently with Contractor to mitigate overruns and explore viable alternatives.
Project Description Fort Loudon Rd Resurface 2
ECMS # 90995
SR-Section 75-014
Contractor Cottle's Asphalt Maintenance, Inc.
Original Contract Value $2,290,908.74
NTP date 8/4/2025
Original Completion Date 8/13/2027
Project Scope This project consists of work on SR 0075-014 with resurfacing
the existing roadway and shoulder using Superpave wearing
and scratch courses, milling in curbed areas and near
structures, base replacement, minor drainage improvements, and guide rail replacement along with other miscellaneous
construction, as indicated on the approved drawings included
in the bid package for STATE ROUTE 0075, SECTION 014, in
FRANKLIN COUNTY, MONTGOMERY TOWNSHIP and
MERCERSBURG BOROUGH, from SR 0995, Welsh Run Road at
Segment 0070 Offset 0541 in Montgomery Township to
Buchanan Trail W in Mercersburg Borough at Segment 0160
Offset 1427, for an overall project length of 21,879.66 linear
the project limits. Work is expected to last for a few months.
A detour is in place during work hours. Contractor's start date
is yet to be determined pending completion of gas line work. No delays or overruns at this time.
• Columbia Gas is nearing completion of their restrictive gas line work within project limits.
• A detour is in place during work hours.
• Contractor's start date is yet to be determined pending completion of gas line work.
• Contractor has indicated they may start work as
early as late summer 2026 depending on their workload this season.
•
Project Description Chambersburg Signals Improvement Phase 2
ECMS # 116146
SR-Section 11-125
Contractor Bruce - Merrilees Electric Company
Original Contract Value $398,120.49
NTP date 9/8/2025
Original Completion Date 7/28/2026
Project Scope This project consists of Signal Improvements at 65
intersections in various locations to include: radar detection, software updates, signal optimization/retiming, and other
miscellaneous construction, all as indicated on the approved
drawings included in the Bid Package for STATE ROUTE 0011,
SECTION 125, in FRANKLIN COUNTY, CHAMBERSBURG
BOROUGH and GREENE, HAMILTON, & GUILFORD
TOWNSHIPS, from Segment 0220 Offset 0700 to Segment
work expected to start in Spring 2026. Construction inspection
services to be performed by Chambersburg Borough. No
overruns or delays.
• Contractor began work at the end of March and
encountered issues early on.
• Existing cabinets at several intersections cannot be modified as shown on plans due to outdated equipment.
• Project Team working through resolving the