Loading...
HomeMy WebLinkAboutInformation Technology Services - Illuminated-Integration.comProposal for: Franklin County For: Court Room 1 Poly Alternative Prepared on: June 4, 2026 Version: 2.0 Project Number: ii-5029 COSTARS 034-E22-163 COURT ROOM SCOPE The Franklin County courts reached out to Illuminated Integration (ii) for a solution to replace their existing court room Poly infrastructure and bring back Zoom functionality to each room. Illuminated met with the stakeholders from the county and court administration to design a sustainable solution. This proposal is for one court room. After successful completion of the first court room, the county will be upgrading the remaining six via separate contract. This project was quoted using COSTARS and prevailing wage labor. COSTARS Contract Number: 034-E22-163 Prevailing Wage Serial Number: 26-03173 Scope of Work Illuminated Integration will provide and install the following as part of the AV systems implementation for each court room: Documentation Updated riser drawings to reflect the changes to the system Video Conferencing Equipment Remove the existing Poly compute device An AV to USB bridge device in each equipment rack USB and HDMI extension from each equipment rack to the new OFE computer located in each court room Crestron programming updates and system commissioning End user training Inclusions Low voltage faceplates Low voltage pulls and terminations for Illuminated Integration installed equipment Exclusions/Others Responsibilities The following items are not included in Illuminated Integrationʼs scope of work: On site refuse disposal containers/locations Provision, installation or commissioning of any systems or devices not explicitly expressed in this scope of work or in the attached bill of materials Client to provide a PC for each court room to act as the meeting host device Client to set up and provision these devices prior to Illuminated Integration arriving on site PC must have at least (2) HDMI outputs and USB 3.0 or higher User monitor at the PC location, keyboard, and mouse provided by client Assumptions All installation work will occur during normal business hours unless otherwise arranged. Adequate pathways, spaces, and provisions will be made available for AVL system infrastructure. Illuminated Integration Franklin County · Court Room 1 Poly Alternative ii-5029 · Version: 2.0 · June 4, 2026 2 of 5 The existing conduit pathways are already very full. If the existing conduit cannot support the two additional network lines for each court room, a change order may be required. The client will designate a point of contact to facilitate approvals, access, and communication throughout the project. Delays in communication may result in extension of the project timeline. Project Timeline A detailed schedule will be established in coordination with the court administration team, with the following high-level phases: Engineering & Submittals: 3-4 weeks Procurement & Pre-Fabrication: 4-6 weeks On-Site Installation: Expect approximately 1 day of on-site installation and testing per court room On site installation time is dependent on room availability and the availability of client IT staff Specific milestone dates will be confirmed upon project kickoff. Comprehensive Warranty Illuminated Integration provides a one-year warranty on all equipment and workmanship supplied for the installed system(s). The warranty period begins at the end of the project, with the start date determined by Illuminated Integration's project manager. A detailed warranty letter will be provided at that time. The warranty covers defects in materials and workmanship for Illuminated Integration-provided equipment and services. If a covered issue arises during the warranty period, Illuminated Integration's team will address it at no additional cost to ensure the system operates as intended. This warranty excludes equipment not provided by Illuminated Integration, reused components, damage from acts of God, structural issues, or misuse by users. Illuminated Integration reserves the right to determine whether damages fall under these exclusions. VIDEO CONFERENCING QTY DESCRIPTION 1 Vaddio 999-8250-000 AV Bridge 2x1 1 AVPro Edge AC-EXUSB-3-KIT 100-meter extension kit for USB 3.2 Gen 1 with a USB-C host and a four USB-A port hub connected via category cable 1 Crestron HD-TXC-4KZ-101 DM Lite® 4K60 4:4:4 Transmitter for HDMI®, RS-232, and IR Signal Extension over CATx Cable 1 Crestron HD-RXC-4KZ-101 DM® Essentials 4K60 4:4:4 Receiver for HDMI®, RS-232, and IR Signal Extension over CATx Cable 0.2 West Penn Wire 254236FBK1000 4 PR #23 FEP FS FLRST 1 Illuminated Integration Programming & Commissioning Illuminated Integration Franklin County · Court Room 1 Poly Alternative ii-5029 · Version: 2.0 · June 4, 2026 3 of 5 ADDITIONAL COSTS ADDITIONAL COSTS QTY DESCRIPTION 1 Illuminated Integration Tier 0 - Technical Drawing Package Update system riser to reflect changes 1 Illuminated Integration Project Management 1 Illuminated Integration System Training Training on the new workflow Illuminated Integration Franklin County · Court Room 1 Poly Alternative ii-5029 · Version: 2.0 · June 4, 2026 4 of 5 PAYMENT SCHEDULE 100% Equipment & Shipping Deposit Due within 30 days of Signing 75% Labor + 75% Travel Due Upon On-Site Start of Work (NET 30) Remaining Balance Due Upon Project Completion (NET 30) **Labor includes installation, engineering, management and programming labor types.** ***Credit Card payment will incur a 4% Fee.*** ***ACH Transfers will incur no additional fees.*** EQUIPMENT TOTAL $3,642.80 SHIPPING TOTAL $0.00 LABOR TOTAL $4,177.00 SHIPPING $63.00 MISC. HARDWARE - UNTAXED $72.00 SUBTOTAL $7,954.80 TOTAL SALES TAX $0.00 PROJECT TOTAL $7,954.80 SIGNED DATE PRINT NAME TITLE SIGNED DATE PRINT NAME TITLE ACCEPTANCE FINANCIAL TERMS Per COSTAR Terms This contract is extended as a binding agreement between Illuminated Integration and Franklin County it is extending services to. This is represented as a complete and accurate summary of scope, services and materials provided herein. ACCEPTANCE FRANKLIN COUNTY ILLUMINATED INTEGRATION Illuminated Integration Franklin County · Court Room 1 Poly Alternative ii-5029 · Version: 2.0 · June 4, 2026 5 of 5 Brett Zahniser Brett Zahniser 6/5/2026 Contract Coordinator