HomeMy WebLinkAboutFranklin MPO TIP Amendment 1HOW TO READ THE TIP MODIFICATION REPORT The enclosed report identifies specific projects and provides details regarding the changes in funding that is being proposed on those projects. The following is an explanation of the items in this report: •"Project Title" provides the project title as it appears in MPMS •“MPMS” is the project identification number in the multi-modal project management system (MPMS). •“Ph” is the project phases that is being adjusted on that line. •“Prog" shows whether the funding on that row is indicative of funding levels before the change, after the change, or as the proposed change. •"Funds - Fed" indicates the type of federal funding being adjusted on that row. Funding abbreviations are as follows: NHPP - National Highway Performance Program STP - Surface Transportation Program BRIP - Bridge Improvement Program BOF - Bridge Off-System •"Funds - Sta." indicates the type of state funding being adjusted on that row. Funding abbreviations are as follows: 185 - State Bridge Construction 581 - Highway Construction, State Infrastructure, Etc. •The next four columns are the dollars as they are or would be programmed on the TIP for each project sorted by TIP year and source of funding as Federal, State, or Local. •"FFY 2029- FFY 2036" indicates funding that is being moved beyond the current 4- year TIP and is anticipated for programming in future TIP updates. •"Remarks" provides a brief description for the purpose of the amendment of each project or project phase FFY 2025-2028 TIP MODIFICATIONS FORM Date: 11/14/2024 Page 1 of 1 Project Title MPMS Ph Prog Fed Sta.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc. PA997 & SR2015 Intersection Before HSIP Before STP Adjust HSIP 997/037 Adjust STP After HSIP Franklin After STP Highway Reserve Before STP 581 Before NHPP Adjust STP 581 Adjust NHPP After STP 581 Franklin After NHPP Remarks After FFY Totals Before FFY Totals Adjustments Franklin This is a reserve line item. 87805 CON FFY 2027 and FFY 2028 for $2,226,778 for storm water basin construction, items for NPDES permit, traffic control, and additional costs for inspection due to overall project cost increase. This project consists of installing two roundabouts at the intersection of PA997 and SR2015 (Tomstown Road) and the intersection of PA997 and Washington Township Boulevard in Washington Township, Franklin County. The estimated let date of this project is 12/12/2024. 106709 CON1 2 FFY (S:\planning\mpo\Harrisburg\meetings\2010 meetings\HATS 2011 tip revisions June 10 to Sept 9 2011 meeting.xls)