HomeMy WebLinkAboutFranklin MPO TIP Amendment 2HOW TO READ THE TIP MODIFICATION REPORT
The enclosed report identifies specific projects and provides details regarding the
changes in funding that is being proposed on those projects.
The following is an explanation of the items in this report:
•"Project Title" provides the project title as it appears in MPMS
•“MPMS” is the project identification number in the multi-modal project
management system (MPMS).
•“Ph” is the project phases that is being adjusted on that line.
•“Prog" shows whether the funding on that row is indicative of funding levels before
the change, after the change, or as the proposed change.
•"Funds - Fed" indicates the type of federal funding being adjusted on that row.
Funding abbreviations are as follows:
NHPP - National Highway Performance Program
STP - Surface Transportation Program
BRIP - Bridge Improvement Program
BOF - Bridge Off-System
•"Funds - Sta." indicates the type of state funding being adjusted on that row.
Funding abbreviations are as follows:
185 - State Bridge Construction
581 - Highway Construction, State Infrastructure, Etc.
•The next four columns are the dollars as they are or would be programmed on the
TIP for each project sorted by TIP year and source of funding as Federal, State, or
Local.
•"FFY 2029- FFY 2036" indicates funding that is being moved beyond the current 4-
year TIP and is anticipated for programming in future TIP updates.
•"Remarks" provides a brief description for the purpose of the amendment of each
project or project phase
FFY 2025-2028 TIP MODIFICATIONS FORM
Date: 11/14/2024
Page 1 of 3
Project Title MPMS Ph Prog Fed Sta.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.
I-81 New Interchange (Exit
12)Before NHPP 581
Before BRIP 185
Before STP
Before sNHPP
Adjust NHPP 581
81/075 Adjust BRIP 185
Adjust STP
Adjust sNHPP
After NHPP 581
After BRIP 185
After STP
Franklin After sNHPP
I-81 New Interchange (Exit
12)Before NHPP 185
Before STP 581
Before
Adjust NHPP 185
CON
(Exit 12) in FFY 2025 for $2,434,315 due to
new interchange (Exit 12) on I-81 at Guilford
Springs Road overpass, Franklin County. Guilford
I-81 is a state-owned bridge. This project has an
estimated let date of 12/11/2025.
1
Franklin
FFY Remarks
Decreasing the CON phase of I-81 New Interchange
(Exit 12) in FFY 2025 for $3,062,284. This is
because the project recieved $20,000,000 in sNHPP
funds in FFY 2027 and 2028. This project consists
of a new interchange (Exit 12) on I-81 at Guilford
Springs Road overpass, Franklin County. Guilford
I-81 is a state-owned bridge. This project has an
estimated let date of 12/11/2025.
93055
(S:\planning\mpo\Harrisburg\meetings\2010 meetings\HATS 2011 tip revisions June 10 to Sept 9 2011 meeting.xls)
FFY 2025-2028 TIP MODIFICATIONS FORM
Date: 11/14/2024
Page 2 of 3
Project Title MPMS Ph Prog Fed Sta.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.
FFY
>
Remarks
Adjust STP 581
Adjust BRIP
After NHPP 185
After STP 581
Franklin After BRIP
Highway Reserve Before STP 581
Before NHPP
Adjust STP 581
Adjust NHPP
After STP 581
Franklin After NHPP
Franklin Bridge Reserve Before BOF
Before BRIP
Adjust BOF 185
Adjust BRIP
3
2 93055 UTL
87804 CON4
87805 CON
(S:\planning\mpo\Harrisburg\meetings\2010 meetings\HATS 2011 tip revisions June 10 to Sept 9 2011 meeting.xls)
FFY 2025-2028 TIP MODIFICATIONS FORM
Date: 11/14/2024
Page 3 of 3
Project Title MPMS Ph Prog Fed Sta.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.
FFY
>
Remarks
After BOF 185
Franklin After BRIP