Loading...
HomeMy WebLinkAboutFranklin MPO TIP Amendment 2HOW TO READ THE TIP MODIFICATION REPORT The enclosed report identifies specific projects and provides details regarding the changes in funding that is being proposed on those projects. The following is an explanation of the items in this report: •"Project Title" provides the project title as it appears in MPMS •“MPMS” is the project identification number in the multi-modal project management system (MPMS). •“Ph” is the project phases that is being adjusted on that line. •“Prog" shows whether the funding on that row is indicative of funding levels before the change, after the change, or as the proposed change. •"Funds - Fed" indicates the type of federal funding being adjusted on that row. Funding abbreviations are as follows: NHPP - National Highway Performance Program STP - Surface Transportation Program BRIP - Bridge Improvement Program BOF - Bridge Off-System •"Funds - Sta." indicates the type of state funding being adjusted on that row. Funding abbreviations are as follows: 185 - State Bridge Construction 581 - Highway Construction, State Infrastructure, Etc. •The next four columns are the dollars as they are or would be programmed on the TIP for each project sorted by TIP year and source of funding as Federal, State, or Local. •"FFY 2029- FFY 2036" indicates funding that is being moved beyond the current 4- year TIP and is anticipated for programming in future TIP updates. •"Remarks" provides a brief description for the purpose of the amendment of each project or project phase FFY 2025-2028 TIP MODIFICATIONS FORM Date: 11/14/2024 Page 1 of 3 Project Title MPMS Ph Prog Fed Sta.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc. I-81 New Interchange (Exit 12)Before NHPP 581 Before BRIP 185 Before STP Before sNHPP Adjust NHPP 581 81/075 Adjust BRIP 185 Adjust STP Adjust sNHPP After NHPP 581 After BRIP 185 After STP Franklin After sNHPP I-81 New Interchange (Exit 12)Before NHPP 185 Before STP 581 Before Adjust NHPP 185 CON (Exit 12) in FFY 2025 for $2,434,315 due to new interchange (Exit 12) on I-81 at Guilford Springs Road overpass, Franklin County. Guilford I-81 is a state-owned bridge. This project has an estimated let date of 12/11/2025. 1 Franklin FFY Remarks Decreasing the CON phase of I-81 New Interchange (Exit 12) in FFY 2025 for $3,062,284. This is because the project recieved $20,000,000 in sNHPP funds in FFY 2027 and 2028. This project consists of a new interchange (Exit 12) on I-81 at Guilford Springs Road overpass, Franklin County. Guilford I-81 is a state-owned bridge. This project has an estimated let date of 12/11/2025. 93055 (S:\planning\mpo\Harrisburg\meetings\2010 meetings\HATS 2011 tip revisions June 10 to Sept 9 2011 meeting.xls) FFY 2025-2028 TIP MODIFICATIONS FORM Date: 11/14/2024 Page 2 of 3 Project Title MPMS Ph Prog Fed Sta.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc. FFY > Remarks Adjust STP 581 Adjust BRIP After NHPP 185 After STP 581 Franklin After BRIP Highway Reserve Before STP 581 Before NHPP Adjust STP 581 Adjust NHPP After STP 581 Franklin After NHPP Franklin Bridge Reserve Before BOF Before BRIP Adjust BOF 185 Adjust BRIP 3 2 93055 UTL 87804 CON4 87805 CON (S:\planning\mpo\Harrisburg\meetings\2010 meetings\HATS 2011 tip revisions June 10 to Sept 9 2011 meeting.xls) FFY 2025-2028 TIP MODIFICATIONS FORM Date: 11/14/2024 Page 3 of 3 Project Title MPMS Ph Prog Fed Sta.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc. FFY > Remarks After BOF 185 Franklin After BRIP Program Summary - Net Changes (S:\planning\mpo\Harrisburg\meetings\2010 meetings\HATS 2011 tip revisions June 10 to Sept 9 2011 meeting.xls)