Loading...
HomeMy WebLinkAboutTIP Amendment 1 Franklin County Planning Department 272 North Second Street Chambersburg, PA 17201 Phone: 717-261-3855 Fax: 717-264-8667 Email: planning@franklincountypa.gov Public Notice The Franklin County Metropolitan Planning Organization (FCMPO) is currently accepting public comment on a proposed amendment to the Federal Fiscal Year 2023-2026 Transportation Improvement Program (TIP). The TIP is the planning document that outlines the highway and transit projects programmed to receive federal funding for Franklin County. Details on the proposed amendments can be found on the MPO webpage at www.franklincountypa.gov/index.php?section=planning_fcmpo or by visiting the Franklin County Planning Department at 272 N. Second St., Chambersburg, PA 17201. The public comment period closes Wednesday, February 15th, 2023 at 4:30 PM. The FCMPO will be considering the amendment at their next regularly scheduled public meeting on February 16th at 10 a.m. Written comments must be received by the close of the comment period to be included at the meeting. Comments may be sent by mail to Franklin County Planning Department, 272 N. Second St., Chambersburg, PA 17201 or by email to planning@franklincountypa.gov. FCMPO assures that no person shall be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination on the grounds of race, color, national origin, religion, or sex. Additionally, with advance notification, accommodations may be provided at any meeting open to the public for those with special needs related to language, speech, sight, or hearing. If you have a request for a special need, wish to file a complaint, or desire additional information, please contact the FCMPO at the Franklin County Planning Department (717) 261-3855 or planning@franklincountypa.gov. Concerns or complaints not addressed by the FCMPO or Planning Department will follow the County’s grievance process. HOW TO READ THE TIP MODIFICATION REPORT The enclosed report identifies specific projects and project phases and provides details regarding the changes in funding by Federal Fiscal Year (FFY) that are being proposed on those line items. The following is an explanation of the items in this report: •"Project Title" provides the project title as it appears in MPMS •“MPMS” is the project identification number in the multi-modal project management system (MPMS). •“Ph” is the project phases that is being adjusted on that line. Phases are coded as follows: PE - Preliminary Engineering FD - Final Design UTL - Utilities ROW - Right of Way CON - Construction •“Prog" shows whether the funding on that row is indicative of funding levels before the change, after the change, or as the proposed change. •"Funds - Fed" indicates the type of federal funding being adjusted on that row. Funding abbreviations are as follows: NHPP - National Highway Performance Program STP - Surface Transportation Program BRIP - Bridge Improvement Program BOF - Bridge Off-System •"Funds - Sta." indicates the type of state funding being adjusted on that row. Funding abbreviations are as follows: 185 - State Bridge Construction 581 - Highway Construction, State Infrastructure, Etc. •The next four columns are the dollars as they are or would be programmed on the TIP for each project sorted by TIP year and source of funding as Federal, State, or Local. •"FFY 2027- FFY 2031" indicates funding that is being moved beyond the current 4- year TIP and is anticipated for programming in future TIP updates. •"Remarks" provides a brief description for the purpose of the amendment of each project or project phase • FFY 2023-2026 TIP MODIFICATIONS FORM Date: 1/17/2023 Page 1 of 2 Project Title MPMS Ph Prog Fed Sta.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc. I-81 New Interchange (Exit 12)Before 185 590,200 Before 581 2,277,000 417,595 81/075 Adjust STP 185 Adjust NHPP 581 Adjust BRIP After STP 185 After BRIP Franklin After NHPP 581 2,277,000 1,831,000 2,755,000 133,000 800,000 Before BRIP 185 Before NHPP 581 Before STP Adjust BRIP 185 81/075 Adjust NHPP 581 Adjust STP After BRIP 185 After NHPP 581 Franklin After STP 1,654,023 2,732,635 2,840,000 Lincoln Way Resurface 3 Before 581 30/0 Adjust 581 -2,337,405 -800,000 3,137,405 Franklin After 3,137,405 Highway Reserve Before STP 581 Before NHPP Adjust STP 581 Adjust NHPP After 2,291,000 Franklin After 116077 CON 4 87805 CON for $3,137,405 to better align with project schedule. This project consists of a resurface on US 30 (Lincoln Way) from SR 2029 (Falling Spring Road) to a tributary of the Conococheague Creek in Guilford Township. Informed Coordinating Committee: Informed Technical Committee: 1/19/2023 Amendment - Highway Funds FFY 2023 FFY 2024 FFY 2025 FFY 2026 Remarks Franklin 3 FFY 2027 - FFY 2031 1 93055 UTL Interchange (Exit 12) in FFY 2024/2025 for $8,139,890 to better align with the current estimated let date. This project consists of a new interchange (Exit 12) on I-81 at Guilford Springs Road overpass, Franklin County. Guilford Springs Road is a Township Road. Bridge over I-81 is a state-owned bridge. This project has a current estimated let date of May 8, 2025. 2 93055 CON Interchange (Exit 12) from FFY 2024/2025 to FFY 2029/2030 for $5,002,485 to better align with the current estimated let date. Also, current estimate. This project consists of a new interchange (Exit 12) on I-81 at Guilford Springs Road overpass, Franklin County. Guilford Springs Road is a Township Road. Bridge over I-81 is a state-owned bridge. This project has a current estimated let date of May 8, 2025. FFY 2023-2026 TIP MODIFICATIONS FORM Date: 1/17/2023 Page 2 of 2 Project Title MPMS Ph Prog Fed Sta.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Remarks FFY 2027 - FFY 2031 Franklin Bridge Reserve Before BOF Before BRIP Adjust BOF Adjust BRIP -1,458,000 After BOF Franklin After 0 2,867,200 0 3,640,195 3,596,000 0 5,605,313 4,427,850 0 4,369,635 4,170,342 0 8,631,152 3,552,405 0Before FFY Totals Program Summary - Net Changes After FFY Totals 5 87804 CON