The Franklin County Metropolitan Planning Organization (FCMPO) is currently accepting public comment on a
proposed amendment to the Federal Fiscal Year 2023-2026 Transportation Improvement Program (TIP). The
TIP is the planning document that outlines the highway and transit projects programmed to receive federal
funding for Franklin County.
Details on the proposed amendments can be found on the MPO webpage at
www.franklincountypa.gov/index.php?section=planning_fcmpo or by visiting the Franklin County Planning
Department at 272 N. Second St., Chambersburg, PA 17201.
The public comment period closes Wednesday, February 15th, 2023 at 4:30 PM. The FCMPO will be
considering the amendment at their next regularly scheduled public meeting on February 16th at 10 a.m. Written
comments must be received by the close of the comment period to be included at the meeting.
Comments may be sent by mail to Franklin County Planning Department, 272 N. Second St., Chambersburg,
PA 17201 or by email to planning@franklincountypa.gov.
FCMPO assures that no person shall be excluded from participation in, be denied the benefits of, or be
otherwise subjected to discrimination on the grounds of race, color, national origin, religion, or sex.
Additionally, with advance notification, accommodations may be provided at any meeting open to the public for
those with special needs related to language, speech, sight, or hearing. If you have a request for a special need,
wish to file a complaint, or desire additional information, please contact the FCMPO at the Franklin County
Planning Department (717) 261-3855 or planning@franklincountypa.gov. Concerns or complaints not
addressed by the FCMPO or Planning Department will follow the County’s grievance process.
HOW TO READ THE TIP MODIFICATION REPORT
The enclosed report identifies specific projects and project phases and provides
details regarding the changes in funding by Federal Fiscal Year (FFY) that are being
proposed on those line items.
The following is an explanation of the items in this report:
•"Project Title" provides the project title as it appears in MPMS
•“MPMS” is the project identification number in the multi-modal project
management system (MPMS).
•“Ph” is the project phases that is being adjusted on that line. Phases are coded as
follows:
PE - Preliminary Engineering
FD - Final Design
UTL - Utilities
ROW - Right of Way
CON - Construction
•“Prog" shows whether the funding on that row is indicative of funding levels before
the change, after the change, or as the proposed change.
•"Funds - Fed" indicates the type of federal funding being adjusted on that row.
Funding abbreviations are as follows:
NHPP - National Highway Performance Program
STP - Surface Transportation Program
BRIP - Bridge Improvement Program
BOF - Bridge Off-System
•"Funds - Sta." indicates the type of state funding being adjusted on that row.
Funding abbreviations are as follows:
185 - State Bridge Construction
581 - Highway Construction, State Infrastructure, Etc.
•The next four columns are the dollars as they are or would be programmed on the
TIP for each project sorted by TIP year and source of funding as Federal, State, or
Local.
•"FFY 2027- FFY 2031" indicates funding that is being moved beyond the current 4-
year TIP and is anticipated for programming in future TIP updates.
•"Remarks" provides a brief description for the purpose of the amendment of each
project or project phase
•
FFY 2023-2026 TIP MODIFICATIONS FORM
Date: 1/17/2023
Page 1 of 2
Project Title MPMS Ph Prog Fed Sta.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.
I-81 New Interchange (Exit
12)Before 185 590,200
Before 581 2,277,000 417,595
81/075 Adjust STP 185
Adjust NHPP 581
Adjust BRIP
After STP 185
After BRIP
Franklin After NHPP 581 2,277,000 1,831,000 2,755,000 133,000 800,000
Before BRIP 185
Before NHPP 581
Before STP
Adjust BRIP 185
81/075 Adjust NHPP 581
Adjust STP
After BRIP 185
After NHPP 581
Franklin After STP 1,654,023 2,732,635 2,840,000
Lincoln Way Resurface 3 Before 581
30/0 Adjust 581
-2,337,405 -800,000 3,137,405
Franklin After 3,137,405
Highway Reserve Before STP 581
Before NHPP
Adjust STP 581
Adjust NHPP
After 2,291,000
Franklin After
116077 CON
4 87805 CON
for $3,137,405 to better align with project
schedule. This project consists of a resurface
on US 30 (Lincoln Way) from SR 2029
(Falling Spring Road) to a tributary of the
Conococheague Creek in Guilford Township.
Informed Coordinating Committee:
Informed Technical Committee: 1/19/2023
Amendment - Highway Funds FFY 2023 FFY 2024 FFY 2025 FFY 2026
Remarks
Franklin
3
FFY 2027 - FFY 2031
1 93055 UTL
Interchange (Exit 12) in FFY 2024/2025 for
$8,139,890 to better align with the current
estimated let date. This project consists of a
new interchange (Exit 12) on I-81 at Guilford
Springs Road overpass, Franklin County.
Guilford Springs Road is a Township Road.
Bridge over I-81 is a state-owned bridge. This
project has a current estimated let date of May
8, 2025.
2 93055 CON
Interchange (Exit 12) from FFY 2024/2025 to
FFY 2029/2030 for $5,002,485 to better align
with the current estimated let date. Also,
current estimate. This project consists of a
new interchange (Exit 12) on I-81 at Guilford
Springs Road overpass, Franklin County.
Guilford Springs Road is a Township Road.
Bridge over I-81 is a state-owned bridge. This
project has a current estimated let date of May
8, 2025.
FFY 2023-2026 TIP MODIFICATIONS FORM
Date: 1/17/2023
Page 2 of 2
Project Title MPMS Ph Prog Fed Sta.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Remarks
FFY 2027 - FFY 2031
Franklin Bridge Reserve Before BOF
Before BRIP
Adjust BOF
Adjust BRIP -1,458,000
After BOF
Franklin After
0 2,867,200 0 3,640,195 3,596,000 0 5,605,313 4,427,850 0 4,369,635 4,170,342 0 8,631,152 3,552,405 0Before FFY Totals
Program Summary - Net Changes
After FFY Totals
5 87804 CON