Loading...
HomeMy WebLinkAboutTIP Amendment 2Franklin County Planning Department 272 North Second Street Chambersburg, PA 17201 Phone: 717-261-3855 Fax: 717-264-8667 Email: planning@franklincountypa.gov Public Notice The Franklin County Metropolitan Planning Organization (FCMPO) is currently accepting public comment on the proposed Amendment #2 to the Federal Fiscal Year 2023-2026 Transportation Improvement Program (TIP). The TIP is the planning document that outlines the highway and transit projects programmed to receive federal funding for Franklin County. Details on the proposed amendments can be found on the MPO webpage at www.franklincountypa.gov/index.php?section=planning_fcmpo or by visiting the Franklin County Planning Department at 272 N. Second St., Chambersburg, PA 17201. The public comment period closes Wednesday, August 16th, 2023 at 4:30 PM. The FCMPO will be considering the amendment at their next regularly scheduled public meeting on August 17th at 10 a.m. Written comments must be received by the close of the comment period to be included at the meeting. Comments may be sent by mail to Franklin County Planning Department, 272 N. Second St., Chambersburg, PA 17201 or by email to planning@franklincountypa.gov. FCMPO assures that no person shall be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination on the grounds of race, color, national origin, religion, or sex. Additionally, with advance notification, accommodations may be provided at any meeting open to the public for those with special needs related to language, speech, sight, or hearing. If you have a request for a special need, wish to file a complaint, or desire additional information, please contact the FCMPO at the Franklin County Planning Department (717) 261-3855 or planning@franklincountypa.gov. Concerns or complaints not addressed by the FCMPO or Planning Department will follow the County’s grievance process. HOW TO READ THE TIP MODIFICATION REPORT The enclosed report identifies specific projects and project phases and provides details regarding the changes in funding by Federal Fiscal Year (FFY) that are being proposed on those line items. The following is an explanation of the items in this report: •"Project Title" provides the project title as it appears in MPMS. •“MPMS” is the project identification number in the multi-modal project management system (MPMS). •“Ph” is the project phase that is being adjusted on that line. Phases are coded as follows: PE - Preliminary Engineering FD - Final Design UTL - Utilities ROW - Right of Way CON - Construction •“Prog" shows whether the funding on that row is indicative of funding levels before the change, after the change, or as the proposed change. •"Funds - Fed" indicates the type of federal funding being adjusted on that row. Funding abbreviations are as follows: NHPP - National Highway Performance Program STP - Surface Transportation Program BRIP - Bridge Improvement Program BOF - Bridge Off-System •"Funds - Sta." indicates the type of state funding being adjusted on that row. Funding abbreviations are as follows: 185 - State Bridge Construction 581 - Highway Construction, State Infrastructure, Etc. •The next four columns are the dollars as they are or would be programmed on the TIP for each project sorted by TIP year and source of funding as Federal, State, or Local. •"FFY 2027- FFY 2031" indicates funding that is being moved beyond the current 4- year TIP and is anticipated for programming in future TIP updates. •"Remarks" provides a brief description for the purpose of the amendment of each project or project phase • FFY 2023-2026 TIP MODIFICATIONS FORM Date: 7/12/2023 Page 1 of 2 Item Project Title MPMS Ph Prog Fed Sta.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.`Sta.Loc. West King Street Bridge Before BRIP 185 Before NHPP 11/095 Adjust BRIP 185 Adjust NHPP After BRIP 185 Franklin After NHPP 1,479,496 1,600,000 Before BRIP 185 Before NHPP 581 Before STP Adjust BRIP 185 81/075 Adjust NHPP 581 Adjust STP After BRIP 185 After NHPP 581 Franklin After STP 1,654,023 2,732,635 Franklin Bridge Reserve Before BOF 185 Before BRIP Adjust BOF 185 Adjust BRIP -2,031,086 After BOF 185 3,216,957 340,800 Franklin After BRIP 3,798,914 Informed Coordinating Committee: Informed Technical Committee: 7/20/2023 Amendment - Highway Funds Remarks Cashflowing the CON phase of I-81 New Interchange (Exit 12) from FFY 2025 to FFY 2031 for $3,518,345 to better utilize current available funding. This project consists of a new interchange (Exit 12) on I-81 at Guilford Springs Road overpass, Franklin County. Guilford Springs Road is a Township Road. Bridge over I-81 is a state-owned bridge. This project has a current estimated let date of June 26, 2025. FFY 2025 for $3,518,345 to the current estimated cost. This increase is for paving limit extensions, temporary and permanent signals, RR flagging, waterline relocation, additional mitigation costs, additional structure costs. 11 over Norfolk Southern Railroad in Shippensburg Borough and Southampton Township, Franklin County. This project has a current estimated let date of Jan. 11, 2024. 1 19304 CON 2 93055 CON 3 87804 CON FFY 2023-2026 TIP MODIFICATIONS FORM Date: 7/12/2023 Page 2 of 2 Item Project Title MPMS Ph Prog Fed Sta.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.`Sta.Loc. Funds Remarks Highway Reserve Before STP 581 Before NHPP Adjust STP 581 Adjust NHPP After STP 581 Franklin After NHPP 2,660,589 1,772,496 4,000,000 0 1,458,000 3,241,900 0 4,472,023 3,502,850 0 4,369,635 4,170,342 0 21,030,957 2,886,395 0 After FFY Totals 4 87805 CON Before FFY Totals Program Summary - Net Changes