Public Notice
The Franklin County Metropolitan Planning Organization (FCMPO) is currently accepting public comment on the proposed Amendment #2 to the Federal Fiscal Year 2023-2026 Transportation Improvement Program (TIP).
The TIP is the planning document that outlines the highway and transit projects programmed to receive federal
funding for Franklin County.
Details on the proposed amendments can be found on the MPO webpage at
www.franklincountypa.gov/index.php?section=planning_fcmpo or by visiting the Franklin County Planning
Department at 272 N. Second St., Chambersburg, PA 17201.
The public comment period closes Wednesday, August 16th, 2023 at 4:30 PM. The FCMPO will be considering
the amendment at their next regularly scheduled public meeting on August 17th at 10 a.m. Written comments
must be received by the close of the comment period to be included at the meeting.
Comments may be sent by mail to Franklin County Planning Department, 272 N. Second St., Chambersburg,
PA 17201 or by email to planning@franklincountypa.gov.
FCMPO assures that no person shall be excluded from participation in, be denied the benefits of, or be
otherwise subjected to discrimination on the grounds of race, color, national origin, religion, or sex.
Additionally, with advance notification, accommodations may be provided at any meeting open to the public for
those with special needs related to language, speech, sight, or hearing. If you have a request for a special need,
wish to file a complaint, or desire additional information, please contact the FCMPO at the Franklin County
Planning Department (717) 261-3855 or planning@franklincountypa.gov. Concerns or complaints not
addressed by the FCMPO or Planning Department will follow the County’s grievance process.
HOW TO READ THE TIP MODIFICATION REPORT
The enclosed report identifies specific projects and project phases and provides
details regarding the changes in funding by Federal Fiscal Year (FFY) that are being
proposed on those line items.
The following is an explanation of the items in this report:
•"Project Title" provides the project title as it appears in MPMS.
•“MPMS” is the project identification number in the multi-modal project
management system (MPMS).
•“Ph” is the project phase that is being adjusted on that line. Phases are coded as
follows:
PE - Preliminary Engineering
FD - Final Design
UTL - Utilities
ROW - Right of Way
CON - Construction
•“Prog" shows whether the funding on that row is indicative of funding levels before
the change, after the change, or as the proposed change.
•"Funds - Fed" indicates the type of federal funding being adjusted on that row.
Funding abbreviations are as follows:
NHPP - National Highway Performance Program
STP - Surface Transportation Program
BRIP - Bridge Improvement Program
BOF - Bridge Off-System
•"Funds - Sta." indicates the type of state funding being adjusted on that row.
Funding abbreviations are as follows:
185 - State Bridge Construction
581 - Highway Construction, State Infrastructure, Etc.
•The next four columns are the dollars as they are or would be programmed on the
TIP for each project sorted by TIP year and source of funding as Federal, State, or
Local.
•"FFY 2027- FFY 2031" indicates funding that is being moved beyond the current 4-
year TIP and is anticipated for programming in future TIP updates.
•"Remarks" provides a brief description for the purpose of the amendment of each
project or project phase
•
FFY 2023-2026 TIP MODIFICATIONS FORM
Date: 7/12/2023
Page 1 of 2
Item Project Title MPMS Ph Prog Fed Sta.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.`Sta.Loc.
West King Street Bridge Before BRIP 185
Before NHPP
11/095 Adjust BRIP 185
Adjust NHPP
After BRIP 185
Franklin After NHPP 1,479,496 1,600,000
Before BRIP 185
Before NHPP 581
Before STP
Adjust BRIP 185
81/075 Adjust NHPP 581
Adjust STP
After BRIP 185
After NHPP 581
Franklin After STP 1,654,023 2,732,635
Franklin Bridge Reserve Before BOF 185
Before BRIP
Adjust BOF 185
Adjust BRIP -2,031,086
After BOF 185 3,216,957 340,800
Franklin After BRIP 3,798,914
Informed Coordinating Committee:
Informed Technical Committee: 7/20/2023
Amendment - Highway Funds
Remarks
Cashflowing the CON phase of I-81 New Interchange
(Exit 12) from FFY 2025 to FFY 2031 for $3,518,345 to
better utilize current available funding. This project
consists of a new interchange (Exit 12) on I-81 at
Guilford Springs Road overpass, Franklin County.
Guilford Springs Road is a Township Road. Bridge over
I-81 is a state-owned bridge. This project has a current
estimated let date of June 26, 2025.
FFY 2025 for $3,518,345 to the current estimated cost.
This increase is for paving limit extensions, temporary
and permanent signals, RR flagging, waterline relocation,
additional mitigation costs, additional structure costs.
11 over Norfolk Southern Railroad in Shippensburg
Borough and Southampton Township, Franklin County.
This project has a current estimated let date of Jan. 11,
2024.
1 19304 CON
2 93055 CON
3 87804 CON
FFY 2023-2026 TIP MODIFICATIONS FORM
Date: 7/12/2023
Page 2 of 2
Item Project Title MPMS Ph Prog Fed Sta.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.`Sta.Loc.
Funds
Remarks
Highway Reserve Before STP 581
Before NHPP
Adjust STP 581
Adjust NHPP
After STP 581
Franklin After NHPP 2,660,589
1,772,496 4,000,000 0 1,458,000 3,241,900 0 4,472,023 3,502,850 0 4,369,635 4,170,342 0 21,030,957 2,886,395 0
After FFY Totals
4 87805 CON
Before FFY Totals
Program Summary - Net Changes