Loading...
HomeMy WebLinkAbout8-20-2026 Meeting Packet Franklin County Planning Department 272 North Second Street Chambersburg, PA 17201 Phone: 717-261-3855 Fax: 717-264-8667 Email: planning@franklincountypa.gov FRANKLIN COUNTY METROPOLITAN PLANNING ORGANIZATION POLICY BOARD MEETING August 20, 2026 – 10:00 am Franklin County Administrative Building, Room 824 272 North 2nd Street Chambersburg, PA 17201 Video call link here Meeting ID: 290 243 155 661 69 Passcode: LW7Dn7fy Or dial: #81984948PIN: 4420-489-233US) +1 ( I. Welcome and Introduction – Sam Cressler II. Moment of Silence III. Pledge of Allegiance IV. Approval of Meeting Minutes – May 21, 2026 and June 22, 2026 – Action V. Business a. Hykes Road over I-81 (MPMS #117143) Status Change - Action b. 2025-2028 TIP Modifications and Fiscal Constraint Chart – Informational c. 2027-2029 UPWP Update – Discussion VI. Partner Updates a. Commute PA Update b. Rabbittransit Update c. PennDOT Update d. FHWA Update e. State/Federal Legislative Update f. Director’s Report – Quentin Clapper g. Staff Report – Matthew Romero VII. Future Meetings a. November 19th – Policy Board Meeting 10:00 A.M. VIII. Public Comment IX. Adjournment “The FCMPO is committed to complying with the nondiscrimination requirements of the Title VI of the Civil Rights Act of 1964 and related statutes and regulations prohibiting discrimination in all programs and activities. All locations for meetings open to the public will be accessible to persons with disabilities. With advance notification, accommodations may be provided for those with special needs related to language, speech, sight, or hearing. If you have a request for a special need, wish to file a complaint, or desire additional information, please contact the Franklin County Planning Department at (717) 261-3855; FAX (717) 264-8667; email: planning@franklincountypa.gov.” Franklin County Planning Department 272 North Second Street Chambersburg, PA 17201 Phone: 717-261-3855 Fax: 717-264-8667 Email: planning@franklincountypa.gov FRANKLIN COUNTY METROPOLITAN PLANNING ORGANIZATION POLICY BOARD MEETING MINUTES May 21, 2026 – 10:00 am Franklin County Administrative Building, Room 824 272 North 2nd Street Chambersburg, PA 17201 Video call link here Meeting ID: 290 243 155 661 69 Passcode: LW7Dn7fy Or dial: 4202-489-233US) +1 ( PIN: 81984948# Members in Attendance: Sam Cressler, Carey Mullins, Richard Reisinger, Jeff Puher, Travis Brookens, David Mackley, Sue Fahnestock, Phil Wolgemuth, Sharon Coffman, Ted Sheehe, Humaira Nabeela, Brandon Leach, Aaron Kitzmiller, Commissioner Dean Horst, Commissioner John Flannery, Commissioner Robert Ziobrowski, John Thierwechter, Carrie Gray, Chad Reichard (v), Matt Boyer (v), Jason Stains (v), Beth Nidham (v), Jeff Puher (v), Rebecca Countess (v), Ronnique Bishop (v) Staff in Attendance: Quentin Clapper and Matthew Romero I.Welcome and Introduction – Sam Cressler II.Moment of Silence III.Pledge of Allegiance IV.Approval of Meeting Minutes – February 19, 2026 – David requested to amend the date of the minutes from 5/21/2026 to 2/19/2026; motion to approve the minutes with edits made by Sharon Coffman, seconded by Commissioner Ziobrowski, motion passes unanimously. V.Business a.2027-2030 Draft Transportation Improvement Program Discussion: •Response to Comments Received – No public comment received. •Air Quality Conformity Determination Report – Motion to accept report introduced by Commissioner Ziobrowski, seconded by Commissioner Flannery, motion passes unanimously. •Air Quality Conformity Resolution – Motion to pass the resolution introduced by David Mackley, seconded by Commissioner Horst, motion passes unanimously. •TIP Resolution – Motion to pass the resolution introduced by David Mackley, seconded by Commissioner Horst, motion passes unanimously. DRA F T • TIP/STIP Memorandum of Understanding – Motion to approve the Memorandum introduced by Commissioner Ziobrowski, seconded by Commissioner Flannery, motion passes unanimously. • 2027-2030 Draft Transportation Improvement Program Adoption – Motion to adopt the 2027-2030 TIP introduced by Sharon Coffman, seconded by David Mackley, motion passes unanimously. • MPO Self-Certification – Quentin Clapper confirmed that the stipulations followed in the document are those we currently follow. Motion to approve the self-certification introduced by Commissioner Ziobrowski, seconded by Commissioner Horst, motion passes unanimously. b. 2025-2028 TIP Modifications – Humaira Nabeela gives a breakdown of the modifications introduced for the 2025-2028 TIP, including modifications to microtransit funding to fiscally support project timing. David Mackley indicates that the listed Exit 12 let date had said May 21st, but that actual let date was for July 16th. VI. Partner Updates a. Commute PA Update – Matt Boyer gives a breakdown of Commute PA activities in recent months, including April’s Earth Day Earthapalooza, May being National Bike Month, promotion for Bike Bash, and promotion for Skip the Pump event in July/August. Reports 225 new app members and 10,000 new trips with 194,000 miles taken off road. b. Rabbittransit Update – No updates, but Beth indicates that peak ridership has been increasing over the last two years to new record-setting levels. c. PennDOT Update – Jeff Puher provides current status for MPO projects. Carey Mullins adds that the Annual Legislative Briefing between Franklin County and Adams County took place on April 30th, and to contact Franklin County staff with any inquiry. d. FHWA Update – No update. e. State/Federal Legislative Update – Sue Fahnestock of Representative Joyce’s Office outlined that the Housing and Urban Development Appropriations Committee, as well as the Transportation Appropriations Committee met to determine funding, with a goal of having an appropriations bill drafted by June 2026. Sue outlines that Representative Joyce continues to push for and request federal funding, including for the ongoing Southgate project. The America 250 Act, which would serve as a five-year transportation reauthorization bill is currently in the works to determine funding and considerations. The Red Tape Act, which would serve to remove duplication authorization for EPA projects, passed with bipartisan support. f. Director’s Report – Quentin Clapper explained that the Planning Department is currently issuing surveys for the Imagine Franklin 2035 Comprehensive Plan’s three-year implementation plan conclusion, and that it is currently available on the Franklin County Planning website until July 2nd. Quentin further explains that the Board of Commissioners has adopted the proposed County ordinance regarding data centers, and that the Planning Department will work with local municipalities to help develop their own ordinances/SALDOs. g. Staff Report – Matthew Romero outlines that following passage of the 2027-2030 TIP at today’s meeting, it will be submitted to PennDOT and FHWA for review and approval before enactment on October 1st. An accompanying TIP-at-a-Glance document breaking down the new TIP is also being finalized and will be available with the approved 2027-2030 TIP on the Franklin County MPO website. Work is also continuing on the LRTP to gather regional data, with the first Steering Committee meeting happening virtually on June 30th. DRA F T VII. Future Meetings a. August 20th – Policy Board Meeting 10:00 A.M. VIII. Public Comment IX. Adjournment – Motion to adjourn introduced by Commissioner Ziobrowski, Sharon Coffman seconded, motion passes unanimously. “The FCMPO is committed to complying with the nondiscrimination requirements of the Title VI of the Civil Rights Act of 1964 and related statutes and regulations prohibiting discrimination in all programs and activities. All locations for meetings open to the public will be accessible to persons with disabilities. With advance notification, accommodations may be provided for those with special needs related to language, speech, sight, or hearing. If you have a request for a special need, wish to file a complaint, or desire additional information, please contact the Franklin County Planning Department at (717) 261-3855; FAX (717) 264-8667; email: planning@franklincountypa.gov.” DRA F T Franklin County Planning Department 272 North Second Street Chambersburg, PA 17201 Phone: 717-261-3855 Fax: 717-264-8667 Email: planning@franklincountypa.gov FRANKLIN COUNTY METROPOLITAN PLANNING ORGANIZATION POLICY BOARD MEETING MINUTES June 22, 2026 – 1:00 PM Video call link here Meeting ID: 277 110 331 173 824 Passcode: ch9Au6EA Or dial: (US) +1 323-489-4202 PIN: 341760931# Members in Attendance: Sam Cressler, Jessee McMath (v), Richard Reisinger (v), David Mackley (v), Jeffrey Puher (v), Travis Brookens (v), Edward Sheehe (v), Phil Wolgemuth (v), Humaira Nabeela (v), Kyle Snyder (v), Carey R Mullins (v), Commissioner Dean Horst, and Commissioner Robert Ziobrowski (v) Staff in attendance: Quentin Clapper, Matthew Romero, and Colleen Tidd I.Welcome and Introduction – Sam Cressler II.New Business a.2025-2028 TIP Amendment – Inclusion of Department of Defense Funding for New Access Point at Letterkenny Army Depot •Jeff Puher speaks on project. •Richard Reisinger shares 2028 Time Frame for project •No improvements to the existing 5-legged intersection. •Approval of Amendment •Motion to approve the TIP amendment made by Commissioner Ziobrowski, Commissioner Horst seconds. Motion passes 9-0-0. III.Future Meetings a.August 20th – Policy Board Meeting 10:00 A.M. IV.Public Comment a.No Public Comment V.Adjournment a.Commissioner Ziobrowski motions to adjourn, David Mackley seconds. Motion passes 9-0-0. DRA F T FFY 2025-2028 TIP MODIFICATIONS FORM Item #Project Title MPMS #Phase Prog Fed Sta.Fed Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc. I-81 New Interchange (Exit 12)Before STP 261,465 Before 81/075 Adjust STP Adjust BRIP 45,490 After STP 261,465 Franklin After BRIP 45,490 Corner Road over Licking Cr Before STP 734,315 Before BRIP 659,685 3009/022 Adjust STP 659,685 Adjust BRIP -659,685 After STP 734,315 659,685 Franklin After BRIP Franklin Bridge Reserve Before BRIP 370,084 Adjust BRIP 614,195 Franklin After BRIP 614,195 370,084 Highway Reserve Before STP 581 14,645 20,564 868,900 2,182,029 1,364,278 3,561,218 Before NHPP 843,439 Adjust STP 581 -659,685 Adjust NHPP After STP 581 14,645 20,564 868,900 2,182,029 704,593 3,561,218 Franklin After NHPP 843,439 3 FD1 Increasing the FD phase of I-81 New Interchange (Exit 12) in FFY 2026 for $45,490. This is to perform environmental activities necessary for project advertisement due to let date push and PNDI expiration along with bat assessments. This project consists of a new interchange (Exit 12) on I-81 at Guilford Springs Road overpass, Franklin County. Guilford Springs Road is a township road and the bridge over I-81 is a state-owned bridge. This project has a current estimated let date of July 16, 2026. 93055 Cashflowing the CON phase of Corner Road over Licking Cr from FFY 2026 to FFY 2028 for $659,685 to better align with the current estimated let date. This project consists of a bridge rehabilitation on SR 3009 (Corner Road) over Licking Creek in Montgomery Township, Franklin County. This project has a current estimated let date of Nov. 5, 2026. CON1169632 4 87805 CON This is a reserve line item. This is a reserve line item. 87804 CON Informed Coordinating Committee: 2/19/26 Informed Technical Committee: N/A Remarks Franklin MPO FFY 2025 FFY 2027FFY 2026 FFY 2028Funds Administrative Modification - Highway & Bridge FFY 2025-2028 TIP MODIFICATIONS FORM Item #Project Title MPMS #Phase Prog Fed Sta.Fed Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.RemarksFFY 2025 FFY 2027FFY 2026 FFY 2028Funds Administrative Modification - Highway & Bridge West King Street Bridge Before BRIP 185 891,219 445,610 387,658 Before NHPP 581 891,220 891,220 57,952 445,609 Before STP 604,000 435,350 Adjust BRIP 185 33,184 11/095 Adjust NHPP 581 Adjust STP After BRIP 185 891,219 445,610 33,184 387,658 After NHPP 581 891,220 891,220 57,952 445,609 Franklin After STP 604,000 435,350 Franklin Bridge Reserve Before BRIP 614,195 370,084 Adjust BRIP -33,184 Franklin After BRIP 581,011 370,084 5 Increasing the CON phase of West King Street Bridge in FFY 2026 for $33,184 for additional construction consultation. This project consists of a bridge replacement on US Route 11 over Norfolk Southern Railroad in Shippensburg Borough and Southampton Township, Franklin County. This project was let on Oct. 24, 2024. CON19304 6 87804 CON This is a reserve line item. FFY 2025-2028 TIP MODIFICATIONS FORM Item #Project Title MPMS #Phase Prog Fed Sta.Fed Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.RemarksFFY 2025 FFY 2027FFY 2026 FFY 2028Funds Administrative Modification - Highway & Bridge I-81 New Interchange (Exit 12)Before NHPP 581 1,932,021 780,780 3,744,048 636,561 1,338,000 Before sNHPP 185 10,000,000 10,000,000 Before STP 6,397 168,292 81/075 Adjust NHPP 581 14,645 1,425,842 Adjust sNHPP 185 Adjust STP After NHPP 581 1,946,666 780,780 3,744,048 636,561 1,425,842 1,338,000 After sNHPP 581 10,000,000 10,000,000 Franklin After STP 6,397 168,292 Highway Reserve Before STP 581 14,645 20,564 868,900 2,182,029 704,593 3,561,218 Before NHPP 843,439 Adjust STP 581 -14,645 -1,425,842 Adjust NHPP After STP 581 20,564 868,900 756,187 704,593 3,561,218 Franklin After NHPP 843,439 Increasing the CON phase of I-81 New Interchange (Exit 12) in FFY 2025/2027 for $1,440,487 to the pre-bid estimate. This project consists of a new interchange (Exit 12) on I- 81 at Guilford Springs Road overpass, Franklin County. Guilford Springs Road is a township road and the bridge over I-81 is a state-owned bridge. This project has a current estimated let date of Aug 27, 2026. CON930557 This is a reserve line item. CON878058 FFY 2025-2028 TIP MODIFICATIONS FORM Item #Project Title MPMS #Phase Prog Fed Sta.Fed Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.RemarksFFY 2025 FFY 2027FFY 2026 FFY 2028Funds Administrative Modification - Highway & Bridge I-81 New Interchange (Exit 12)Before STP 261,465 Before BRIP 45,490 81/075 Adjust STP Adjust BRIP 22,859 After STP 261,465 Franklin After BRIP 68,349 Franklin Bridge Reserve Before BRIP 581,011 370,084 Adjust BRIP -22,859 Franklin After BRIP 558,152 370,084 9 This is a reserve line item. Increasing the FD phase of I-81 New Interchange (Exit 12) in FFY 2026 for $22,859 for an amendment to approved NPDES permit and ROW plan changes. This project consists of a new interchange (Exit 12) on I-81 at Guilford Springs Road overpass, Franklin County. Guilford Springs Road is a township road and the bridge over I-81 is a state-owned bridge. This project has a current estimated let date of August 27, 2026. CON FD 87804 93055 10 FFY 2025-2028 TIP MODIFICATIONS FORM Item #Project Title MPMS #Phase Prog Fed Sta.Fed Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.RemarksFFY 2025 FFY 2027FFY 2026 FFY 2028Funds Administrative Modification - Highway & Bridge West King St over Falling Spring Ck Before BOF 118,927 Before BRIP 275,000 7401/BRG Adjust BOF -118,927 299,816 94,111 Adjust BRIP -275,000 After BOF 299,816 94,111 Franklin After BRIP West King St over Falling Spring Ck Before BOF 33,765 7401/BRG Adjust BOF -33,765 33,765 Franklin After BOF 33,765 West King St over Falling Spring Ck Before BOF 45,020 7401/BRG Adjust BOF -45,020 45,020 Franklin After BOF 45,020 West King St over Falling Spring Ck Before BOF 857,000 279,974 Before STP 250,000 7401/BRG Adjust BOF -857,000 -94,111 Adjust STP After BOF 185,863 Franklin After STP 250,000 West King St over Conococheague Ck Before BOF 193,927 Before BRIP 200,000 7401/BR Adjust BOF -193,927 393,927 Adjust BRIP -200,000 After BOF 393,927 Franklin After BRIP West King St over Conococheague Ck Before BOF 39,452 7401/BR Adjust BOF -39,452 39,452 Franklin After BOF 39,452 West King St over Conococheague Ck Before BOF 45,020 7401/BR Adjust BOF -45,020 45,020 Franklin After BOF 45,020 West King St over Conococheague Ck Before BOF 112,496 Before STP 588,866 842,740 Before 7401/BR Adjust BOF Adjust STP -588,866 Adjust BRIP 370,084 After BOF 112,496 After STP 842,740 Franklin After BRIP 370,084 Franklin Bridge Reserve Before BRIP 558,152 370,084 Before BOF Adjust BRIP 475,000 -370,084 Adjust BOF 476,111 After BRIP 1,033,152 Franklin After BOF 476,111 Highway Reserve Before STP 581 20,564 868,900 756,187 704,593 3,561,218 Before NHPP 843,439 Adjust STP 581 588,866 Adjust NHPP After STP 581 20,564 1,457,766 756,187 704,593 3,561,218 Franklin After NHPP 843,439 19 87804 CON This is a reserve line item. 18 17 16 14 13 12 Cashflowing the CON phase of West King St over Falling Spring Ck from FFY 2027/2028 to FFY 2030 for $951,111 to better align with the current estimated let date. This project may consist of a bridge improvement (replacement, rehabilitation or preservation) on West King Street over Falling Spring Creek in Chambersburg Borough, Franklin County. This project has a current estimated let date of Oct. 7, 2027.CON117071 117071 UTL 117071 ROW 117072 UTL 117072 ROW 117072 CON Cashflowing the UTL phase of West King St over Falling Spring Ck from FFY 2026 to FFY 2027 for $33,765 to better align with the current schedule. This project may consist of a bridge improvement (replacement, rehabilitation or preservation) on West King Street over Falling Spring Creek in Chambersburg Borough, Franklin County. This project has a current estimated let date of Oct. 7, 2027.Cashflowing the ROW phase of West King St over Falling Spring Ck from FFY 2026 to FFY 2027 for $45,020 to better align with the current schedule. This project may consist of a bridge improvement (replacement, rehabilitation or preservation) on West King Street over Falling Spring Creek in Chambersburg Borough, Franklin County. This project has a current estimated let date of Oct. 7, 2027. Cashflowing the UTL phase of West King St over Conococheague Ck from FFY 2026 to FFY 2027 for $39,452 to better align with the current schedule. This project may consist of a bridge improvement (replacement, rehabilitation or preservation) on West King Street over Conococheague Creek in Chambersburg Borough, Franklin County. This project has a current estimated let date of Oct. 7, 2027.Cashflowing the ROW phase of West King St over Conococheague Ck from FFY 2026 to FFY 2027 for $45,020 to better align with the current schedule. This project may consist of a bridge improvement (replacement, rehabilitation or preservation) on West King Street over Conococheague Creek in Chambersburg Borough, Franklin County. This project has a current estimated let date of Oct. 7, 2027.Cashflowing the CON phase of West King St over Conococheague Ck from FFY 2027 to FFY 2028 & FFY 2030 for $588,866 to better align with the current estimated let date. This project may consist of a bridge improvement (replacement, rehabilitation or preservation) on West King Street over Conococheague Creek in Chambersburg Borough, Franklin County. This project has a current estimated let date of Oct. 7, 2027. 117072 FD Cashflowing the FD phase of West King St over Conococheague Ck from FFY 2026 to FFY 2027 for $393,927 to better align with the current schedule. This project may consist of a bridge improvement (replacement, rehabilitation or preservation) on West King Street over Conococheague Creek in Chambersburg Borough, Franklin County. This project has a current estimated let date of Oct. 7, 2027.15 FD11707111 CON8780520 This is a reserve line item. Cashflowing the FD phase of West King St over Falling Spring Ck from FFY 2026 to FFY 2027/2028 for $393,927 to better align with the current schedule. This project may consist of a bridge improvement (replacement, rehabilitation or preservation) on West King Street over Falling Spring Creek in Chambersburg Borough, Franklin County. This project has a current estimated let date of Oct. 7, 2027. FFY 2025-2028 TIP MODIFICATIONS FORM Item #Project Title MPMS #Phase Prog Fed Sta.Fed Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.RemarksFFY 2025 FFY 2027FFY 2026 FFY 2028Funds Administrative Modification - Highway & Bridge Lincoln Way Intersection Safety Imp Before STP 292,000 30/150 Adjust STP -292,000 600,000 Franklin After STP 600,000 Lincoln Way Intersection Safety Imp Before STP 54,000 30/150 Adjust STP -54,000 250,000 Franklin After STP 250,000 Lincoln Way Intersection Safety Imp Before STP 250,000 30/150 Adjust STP -250,000 350,000 Franklin After STP 350,000 Highway Reserve Before STP 581 20,564 1,457,766 756,187 704,593 3,561,218 Before NHPP 843,439 Adjust STP 581 596,000 -1,200,000 Adjust NHPP After STP 581 616,564 257,766 756,187 704,593 3,561,218 Franklin After NHPP 843,439 23 114555 ROW 24 87805 CON This is a reserve line item. Cashflowing and increasing the ROW phase of Lincoln Way Intersection Safety Imp from FFY 2026 to FFY 2027 for $350,000 to better align with the current schedule and cost estimate. This project may consist of safety improvements, potentially including an intersection realignment with lane widening or converting the intersection to a roundabout at the intersection of US 30 (Lincoln Way) and SR 4013 (Sollenberger Road) in Hamilton Township and Chambersburg Borough,Franklin County. This project has a current estimated let date of Feb. 17, 2028. Cashflowing and increasing the UTL phase of Lincoln Way Intersection Safety Imp from FFY 2026 to FFY 2027 for $250,000 to better align with the current schedule and cost estimate. This project may consist of safety improvements, potentially including an intersection realignment with lane widening or converting the intersection to a roundabout at the intersection of US 30 (Lincoln Way) and SR 4013 (Sollenberger Road) in Hamilton Township and Chambersburg Borough,Franklin County. This project has a current estimated let date of Feb. 17, 2028. Cashflowing and increasing the FD phase of Lincoln Way Intersection Safety Imp from FFY 2026 to FFY 2027 for $600,000 to better align with the current schedule and cost estimate. This project may consist of safety improvements, potentially including an intersection realignment with lane widening or converting the intersection to a roundabout at the intersection of US 30 (Lincoln Way) and SR 4013 (Sollenberger Road) in Hamilton Township and Chambersburg Borough,Franklin County. This project has a current estimated let date of Feb. 17, 2028. UTL114555 FD114555 22 21 FFY 2025-2028 TIP MODIFICATIONS FORM Item #Project Title MPMS #Phase Prog Fed Sta.Fed Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.Fed.Sta.Loc.RemarksFFY 2025 FFY 2027FFY 2026 FFY 2028Funds Administrative Modification - Highway & Bridge PA997 & SR2015 Intersection Before HSIP 1,271,000 3,298,533 Before STP 2,939,373 101,350 145,800 997/037 Adjust HSIP Adjust STP 249,936 After HSIP 1,271,000 3,298,533 Franklin After STP 2,939,373 351,286 145,800 Highway Reserve Before STP 581 616,564 257,766 756,187 704,593 3,561,218 Before NHPP 843,439 Adjust STP 581 -249,936 Adjust NHPP After STP 581 366,628 257,766 756,187 704,593 3,561,218 Franklin After NHPP 843,439 2,647,904 2,392,276 0 3,408,191 4,357,950 0 13,083,215 2,627,638 0 13,442,446 3,561,218 0 0 14,645 0 0 0 0 0 1,425,842 0 0 0 0 1,425,842 2,647,904 460,255 0 2,621,014 445,610 0 2,446,654 2,627,638 0 2,104,446 3,561,218 0 Before FFY Totals Program Summary - Net Changes Adjustments After FFY Totals 25 106709 CON 26 87805 CON Increasing the CON phase of PA997 & SR2015 Intersection in FFY 2026 for $249,936 for additional construction inspection. This project consists of installing two roundabouts at the intersection of PA997 and SR2015 (Tomstown Road) and the intersection of PA997 and Washington Township Boulevard in Washington Township, Franklin County. This project was let on Jan. 16, 2025. This is a reserve line item. FISCAL CONSTRAINT CHART FFY 2025-2028 TIP Highway/Bridge Project Title MPMS Phase Amts Fed State Federal State Loc/Oth Federal State Loc/Oth Federal State Loc/Oth Federal State Loc/Oth Interstate Contingency Before NHPP 26,358,047 6,357,272 71,909 /Adjust NHPP (3,731,236) Central Office After NHPP 22,626,811 6,357,272 71,909 I-81 Maryland to Mile 6 Before NHPP TOLL 20,283,267 621,223 81/099 Adjust NHPP TOLL 3,731,236 Franklin After NHPP TOLL 20,283,267 4,352,459 $20,283,267 $0 $0 $26,979,270 $0 $0 $6,357,272 $0 $0 $71,909 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $20,283,267 $0 $0 $26,979,270 $0 $0 $6,357,272 $0 $0 $71,909 $0 $0 Remarks Administrative Action (MA ID: 146485) Interstate & D8 Fund Type FFY 2025 FFY 2026 FFY 2027 FFY 2028 State match provided via toll credits. NOTES 75891 CON Line item used as funding source to maintain fiscal constraint. 92006 CON-TOLL CON cost increase. Project was let on 2/13/2025. Before Totals Adjustment Totals After Totals Actions do not affect air quality conformity. \\pdkbdata2k01\data\Planning\MPO-RPO\Franklin County\Franklin MPO Meetings\Franklin MPO 2026 Meetings\August 2026\Statewide\FCC310-D8 NHPP MPMS 92006 increase CON -mjc FISCAL CONSTRAINT CHART FFY 2025-2028 TIP Highway/Bridge Project Title MPMS Phase Amts Fed State Federal State Loc/Oth Federal State Loc/Oth Federal State Loc/Oth Federal State Loc/Oth PA997 & SR2015 Intersection Before HSIP 1,271,000 1,301,000 1,301,000 449,383 997/037 Adjust HSIP 1,997,533 (1,301,000)(449,383) Franklin After HSIP 1,271,000 3,298,533 HSIP Line Item Before HSIP /Adjust HSIP Franklin After HSIP HSIP Set Aside Reserve Before sHSIP 14,792,221 38,849,500 34,343,882 /Adjust sHSIP (1,997,533)1,301,000 449,383 Central Office After sHSIP 12,794,688 40,150,500 34,793,265 $1,271,000 $0 $0 $16,093,221 $0 $0 $40,150,500 $0 $0 $34,793,265 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,271,000 $0 $0 $16,093,221 $0 $0 $40,150,500 $0 $0 $34,793,265 $0 $0 NOTES 87816 CON Regional Reserve Before Totals Adjustment Totals After Totals Actions do not affect air quality conformity. 106709 CON AC conversion to regular obligation 101969 CON HSIP Set Aside Reserve line item used as balancing source of funds to maintain fiscal constraint. Remarks Administrative Action (MA ID: ) Statewide & Franklin TIPs Fund Type FFY 2025 FFY 2026 FFY 2027 FFY 2028 \\pdkbdata2k01\data\Planning\MPO-RPO\Franklin County\Franklin MPO Meetings\Franklin MPO 2026 Meetings\August 2026\Statewide\FCC644 - D8 HSIP MPMS 106709 Adv Inc- wjh Franklin MPO Meeting Project Updates August 2026 Meeting Project Description West King Street Bridge ECMS # 19304 SR-Section 11-095 Contractor J.D. Eckman, Inc. Original Contract Value $12,877,625.31 NTP date 12/9/2024 Original Completion Date 11/14/2028 Project Scope This project consists of a bridge replacement on SR 0011 (West King Street) over Norfolk Southern Railroad and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0011, SECTION 095, in FRANKLIN COUNTY, SOUTHAMPTON TOWNSHIP and SHIPPENSBURG BOROUGH, from Segment 0540 Offset 3134 to Segment 0560 Offset 0111, for an overall project length of 1,164.00 linear requested updates and relocation meetings. Tree trimming was performed and aerial relocations are underway. Coordination with Norfolk Southern Railroad is ongoing. Hopefully project will receive the green light to begin construction in the coming weeks. Project is currently six months behind. Project team is working diligently with Contractor to mitigate all potential delay costs. Project Update • Utility relocations are complete. • Coordination with Norfolk Southern Railroad is ongoing and has not been an issue. • Contractor mobilized to site and started bridge demolition and installing support of excavation system. • Project is slightly behind schedule but project team is working diligently with Contractor to mitigate all potential Project Description PA997 & SR2015 Intersection ECMS # 106709 SR-Section 997-037 Contractor Mitchell Knorr dba Mitchell Knorr Contracting Original Contract Value $6,224,217.92 NTP date 3/3/2025 Original Completion Date 8/22/2028 Project Scope This project is for roadway widening, roundabout construction, ADA curb ramps, drainage improvements, stormwater management, lighting, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0997, SECTION 037, and for STATE ROUTE 2015, SECTION 009, in FRANKLIN COUNTY, WASHINGTON TOWNSHIP, from 800 feet south of SR 2015 (Orchard Road/Tomstown Road) at Segment 0100 Offset 0098 to 1500 feet north of SR 2015 (Orchard stage two sequence where it will remain for several months. Contractor is currently placing concrete for curb islands and gutters. Roadway grading is also taking place. Contractor working on subgrade, subbase and base course installation. No significant overruns or delays. Project Update • Contractor is working diligently on constructing both roundabouts. Each roundabout is about half finished. • Approximately half of the concrete curb, sidewalk and splitter islands are in place. • Base and binder asphalt layers have been placed throughout portions of each roundabout. • Temporary traffic signals are in place but will be removed in the very near future as project is getting ready for the next stage. • Project Description I-81 Maryland to Mile 6 ECMS # 92006 SR-Section 81-099 Contractor New Enterprise Stone and Lime Co. Inc. Original Contract Value $17,840,777.77 NTP date 3/24/2025 Original Completion Date 7/16/2027 Project Scope This project consists of milling, concrete patching, asphalt resurfacing, guiderail updates, signage, and pavement markings on I-81 Northbound and Southbound from the Maryland State Line to Milepost 6, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0081, SECTION 099, in FRANKLIN COUNTY, ANTRIM TOWNSHIP, from Segment 0002 Offset 0000 and Segment 0003 Offset 0000 to Segment 0060 Offset 1831 and Segment 0061 Offset 1831, including adjacent interchange ramps SR 8001, SR 8003, and SR 8005, for an overall project length of 33,543.00 Previous Update Contractor has begun milling and paving operations on Interstate 81 North and South from Maryland State Line to mile marker 3. This pavement section is the worst within project limits. Extensive full and partial depth concrete repairs have been encountered southbound. Large quantity overruns will be needed to repair concrete prior to placing asphalt binder course. Additional quantity of asphalt binder course will also be needed due to unexpected depths through superelevated sections. Project is on track to be finished by original completion date but Project Team is working diligently with Contractor to mitigate overruns and explore viable alternatives. Project Update • Contractor continues milling and paving operations on Interstate 81 North and South from Maryland State Line to mile marker 3. • Extensive full and partial depth concrete repairs were completed. • Crews are working to place binder course followed by stone matrix asphalt wearing course. • Contractor indicated they are ahead of schedule and expect to finish project by the end of this year. • Significant overruns include partial and full depth concrete patching in addition to significant additional tonnage was needed for binder course in order to re-establish Project Description Fort Loudon Rd Resurface 2 ECMS # 90995 SR-Section 75-014 Contractor Cottle's Asphalt Maintenance, Inc. Original Contract Value $2,290,908.74 NTP date 8/4/2025 Original Completion Date 8/13/2027 Project Scope This project consists of work on SR 0075-014 with resurfacing the existing roadway and shoulder using Superpave wearing and scratch courses, milling in curbed areas and near structures, base replacement, minor drainage improvements, and guide rail replacement along with other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 0075, SECTION 014, in FRANKLIN COUNTY, MONTGOMERY TOWNSHIP and MERCERSBURG BOROUGH, from SR 0995, Welsh Run Road at Segment 0070 Offset 0541 in Montgomery Township to Buchanan Trail W in Mercersburg Borough at Segment 0160 Offset 1427, for project limits. A detour is in place during work hours. Contractor's start date is yet to be determined pending completion of gas line work. Contractor has indicated they may start work as early as late summer 2026 depending on their workload this season. No delays or overruns at this time. Project Update • Columbia Gas completed their restrictive gas line work within project limits. • Contractor's start date is yet to be determined pending their work load this season. • They may start late summer 2026 but have mentioned that they might not start until spring 2027. • Project Description Chambersburg Signals Improvement Phase 2 ECMS # 116146 SR-Section 11-125 Contractor Bruce - Merrilees Electric Company Original Contract Value $398,120.49 NTP date 9/8/2025 Original Completion Date 7/28/2026 Project Scope This project consists of Signal Improvements at 65 intersections in various locations to include: radar detection, software updates, signal optimization/retiming, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0011, SECTION 125, in FRANKLIN COUNTY, CHAMBERSBURG BOROUGH and GREENE, HAMILTON, & GUILFORD TOWNSHIPS, from Segment 0220 Offset Existing cabinets at several intersections cannot be modified as shown on plans due to outdated equipment. Project Team working through resolving the matter and potentially updating several cabinets. Project Update • Traffic signal controller cabinets that were added to the project are subject to an estimated manufacturer lead time of eight to ten weeks. • Contractor is working to complete all contract work that is not directly impacted by the added controller cabinets by the contract completion date of July 28, 2026. • Contractor submitted and was granted a time extension of 114 calendar days to procure and install controller cabinets. This extension consists of 70 calendar days to accommodate the ten week lead time for delivery of the controller cabinets, 14 calendar days for installation, and a 30-day operational test period following installation. • Project Description Rocky Mountain Creek Bridge ECMS # 90839 SR-Section 30-103 Contractor Susquehanna Valley Construction Corporation Original Contract Value $4,668,255.00 NTP date 6/22/2026 Original Completion Date 11/2/2028 Project Scope This project consists of the replacement of the SR 0030-103 structure, including minor approach work, guide rail updates, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0030, SECTION 103, in FRANKLIN COUNTY, GREEN TOWNSHIP, from Segment 0584 Offset 2199 to Segment 0600 Offset Project Update • Project pre-construction meeting was held on Monday June 22, 2026. • Utility relocation meeting was held and project is currently Project Description Path Valley Road Resurface ECMS # 113332 SR-Section 75-015 Contractor P & W Excavating, Inc. Original Contract Value $2,614,021.55 NTP date 6/23/2026 Original Completion Date 4/30/2027 Project Scope This is a resurfacing project which consists of asphalt resurfacing, milling, base repair, minor drainage improvements, guiderail updates, line painting, sign updates, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for STATE ROUTE 0075, SECTION 015, in FRANKLIN COUNTY, FANNETT TOWNSHIP, starting on SR 0075 (Path Valley Road) at Segment 0700 Offset 3067 and continuing north on SR 0075 to Segment 0810 Offset 0096, for an overall project length of 26,868.00 linear feet (5.09 miles). Project Update • Pre-construction meeting held on Monday June 22, 2026. • Contractor anticipates starting physical work in early August.